Skip to main content

Bolt relaunches in Spain

E-scooter provider returns to Madrid and Malaga
By Adam Hill May 28, 2020 Read time: 1 min
Bolt is promoting its scooters as Spain emerges from lockdown (© Bolt)

Bolt is relaunching its electric scooter service in two Spanish cities as the country makes its first moves out of coronavirus lockdown.

Its vehicles will be available in the capital, Madrid, and the coastal town of Malaga.

In order to promote itself as a transport alternative in the return-to-work phase, Bolt has introduced a new pricing model which it says creates the most affordable micromobility option for users intending to make longer trips.

There will be no unlocking fee for e-scooters and the price per minute is now €0.23 for the first nine minutes of travel, and then €0.18 thereafter. 

To improve safety, the maximum speed permitted will be 25km/h. Bolt has also created a 'beginner' mode, which allows scooters to be limited, via its app, to just 15 km/h.

It is possible to travel 40km on a single battery charge, the firm insists.

Paul Álvarez, Bolt's director of operations for southern Europe, says: “With a return to normal work, shared electric scooters are a safe, economical and sustainable transport alternative." 

Bolt says it is disinfecting all e-scooters daily, and will deploy 500 GPS-enabled units between the two locations.

For more information on companies in this article

Related Content

  • Tolling faces up to unprecedented challenge
    October 9, 2020
    The next five years are likely to see a number of changes – but the tolling industry will be equal to them, thinks the IBTTA’s Bill Cramer. The best minds in the business are on the case…
  • Bolt and Drover show attachment
    November 30, 2022
    PathPilot AI camera device, which encourages safe riding, will be added to Bolt scooters
  • ChargeWheel sparks mobile EV charging in San Francisco
    April 8, 2019
    ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 electric
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.