Skip to main content

WSP/Parsons Brinckerhoff deploys connected vehicle technology for US army test

As part of the Planet M initiative, the US Army Tank Automotive Research Development and Engineering Center (TARDEC) and the Michigan Department of Transportation (MDOT) have partnered to test connected vehicle applications on the I-69 freeway in Lapeer County, Michigan. WSP/Parsons Brinckerhoff is part of the MDOT team leading the infrastructure deployments. The test involved the installation of six road side units (RSU) at different locations to create a vehicle communications system. The system evalu
July 1, 2016 Read time: 2 mins
As part of the 8439 Planet M initiative, the US Army Tank Automotive Research Development and Engineering Center (TARDEC) and the 1688 Michigan Department of Transportation (MDOT) have partnered to test connected vehicle applications on the I-69 freeway in Lapeer County, Michigan. 6666 WSP/4983 Parsons Brinckerhoff is part of the MDOT team leading the infrastructure deployments.

The test involved the installation of six road side units (RSU) at different locations to create a vehicle communications system. The system evaluates various vehicle-to-infrastructure applications, including speed recommendation, curve speed warning, lane closure warning and disabled vehicle warning.

WSP/Parsons Brinckerhoff is leading the team responsible for the infrastructure installations, RSU software configurations, network architecture development, and backhaul communication and testing. In addition, the firm coordinated a system mock-up test with all parties involved, which was conducted in a lab environment prior to the actual live testing on I-69. During the live testing, the firm provided as-needed on-site technical support with the radio configurations and troubleshooting, leading to a highly successful test. RSUs are being decommissioned and reinstalled at permanent locations on I-69 for future real-world applications.

Related Content

  • March 1, 2016
    WSP/Parsons Brinckerhoff releases primer on driverless vehicles
    WSP/Parsons Brinckerhoff has released a guide for state, regional and local government officials in responding to the infrastructure and policy changes that the advent of driverless vehicles will require. The guide, Driving Towards Driverless: A Guide for Government Agencies, was researched and written by Lauren Isaac, manager of sustainable transportation at WSP/Parsons Brinckerhoff and the firm’s William Barclay. According to Isaac, driverless vehicles have the potential to change all aspects of mobility
  • December 20, 2016
    American Center for Mobility plans connected vehicle test centre in Michigan
    WSP/Parsons Brinckerhoff has been awarded a contract by the American Center for Mobility (ACM) to develop a concept of operations, system requirements, and a procurement strategy for the technology elements of a major new connected and automated vehicle test site facility. The ACM will be built on more than 335 acres adjacent to Willow Run Airport in Ypsilanti, where B-24 bombers were made during World War II in a factory built by Henry Ford. It aims to become a national advanced automotive testing and p
  • January 6, 2016
    WSP/Parsons Brinckerhoff designing segment of I-4 in Florida
    As part of its I-4 Ultimate and Beyond the Ultimate widening projects, the Florida Department of Transportation (FDOT) has awarded a contract to WSP/Parsons Brinckerhoff to design the reconstruction and widening of a nine-mile segment of I-4 in Seminole County. The project involves reconstruction and widening of I-4 from the existing six-lane divided interstate to a ten-lane divided interstate. The concept design proposes the addition of two new barrier-separated express lanes in each direction for a tot
  • July 4, 2014
    Parsons Brinckerhoff to modernise Michigan freeway
    Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin