Skip to main content

TfL appoints electric vehicle charge point operators

Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network. The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging poi
April 27, 2017 Read time: 2 mins
1466 Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network.


The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging points in the ground by the end of this year, with the network growing to 150 by the end of 2018 and 300 fully functioning by 2020. The integrated network means drivers can use all five suppliers at no additional cost.  

TfL is working with the boroughs and investing US$23 million (£18 million) to unlock potential sites, including upgrading the power supply. Strategic hubs are also being evaluated on arterial roads, owned and maintained by TfL, and on private land, including Heathrow Airport and multiple Shell service stations. These are off-road locations that have potential to house a number of rapid charge points.

Customers will be supported by 24-hour, seven-day-a-week call centres and have the latest information at their fingertips, such as the location and availability of charging points, both on the web and through apps. The location data will be made available, tapping into the creativity of the app-developing community.

For more information on companies in this article

Related Content

  • Covid-19 and transportation: Maintaining critical operations in times of crisis
    September 12, 2020

     

    What were the major impacts of Covid-19 on transportation?

    At the peak of the shutdowns, passenger use of airports and mass transit was down 90 per cent. Use of roads by private vehicles was 60 per cent lower and use of commercial vehicles was down 10 per cent. Public transit was down 76 per cent and had to keep operating to get essential workers to their places of employment.

  • ACE report: private sector and user-pay for English roads
    May 16, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report - and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas. Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently-published report Funding Roads for the Future. The 25-page document by the London-based Association for Consultancy and Engineering (ACE) calls for a radical rethink about how to
  • DriveNow London expands car-sharing fleet with EVs
    May 20, 2015
    London’s DriveNow has expanded its car-sharing service with the addition of thirty BMW i3 electric vehicles (EVs). , The BMW/Sixt joint venture offers one-way flexible car-sharing in the North London boroughs of Islington, Hackney, Haringey and Waltham Forest. Following its launch in December 2014, this takes the growing fleet total to 270 vehicles being used across the boroughs, offering residents and businesses a viable alternative to use of private cars with it's on demand, pay per use model. Commentin
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b