Skip to main content

TfL appoints electric vehicle charge point operators

Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network. The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging poi
April 27, 2017 Read time: 2 mins
1466 Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network.


The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging points in the ground by the end of this year, with the network growing to 150 by the end of 2018 and 300 fully functioning by 2020. The integrated network means drivers can use all five suppliers at no additional cost.  

TfL is working with the boroughs and investing US$23 million (£18 million) to unlock potential sites, including upgrading the power supply. Strategic hubs are also being evaluated on arterial roads, owned and maintained by TfL, and on private land, including Heathrow Airport and multiple Shell service stations. These are off-road locations that have potential to house a number of rapid charge points.

Customers will be supported by 24-hour, seven-day-a-week call centres and have the latest information at their fingertips, such as the location and availability of charging points, both on the web and through apps. The location data will be made available, tapping into the creativity of the app-developing community.

For more information on companies in this article

Related Content

  • New Mersey crossing ends Halton’s congestion misery
    December 5, 2017
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • Heathrow set to trial electric vehicles
    October 26, 2012
    London’s Heathrow airport is to trial a fleet of electric vehicles, including the Nissan LEAF, Peugeot iOn, Vauxhall Ampera and the Renault Kangoo ZE, to test the viability of electric power-trains used in the highly demanding context of daily airport operations. Heathrow Airport, which supports a potential switch to zero-emission ground based vehicles, British Airways, LSG SkyChefs and Gate Gourmet will be using the electric vehicles within their normal fleet to better understand the suitability or otherwi
  • New ticketing system for Dakar's 100% electric BRT
    June 4, 2024
    Riders in Senegal's capital can use Calypso cards, contactless tickets and QR code tickets
  • Most EV charging ‘takes place at home’
    July 30, 2015
    New analysis by plug-in vehicle campaign Go Ultra Low suggests that British motorists could no longer have to rely on the conventional petrol station. More than 90 per cent of electric vehicle (EV) charging takes place at home while total charging volumes have almost tripled since 2014, according to new usage data from leading infrastructure provider Chargemaster. Coupled with bumper uptake of plug-in vehicles – more than 14,500 were registered in the first half of 2015 – the new findings point to the po