Skip to main content

Real-time driving data reveals rush hour congestion on London’s road during tube strike

Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action. According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. Th
February 6, 2017 Read time: 2 mins
Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, 6897 Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action.

According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. There was also 34 per cent heavy traffic, so nearly 60 per cent of total traffic at crawling or worse. Trips took on average 1hr 12 minutes longer than usual to get from Uxbridge to East Acton when approaching city from the West.

Waze says the worst routes included Temple to Trafalgar Square (1 mile) which took 40 minutes (34 minutes more than usual). By comparison, this route should take 13 minutes to walk.

On Brecknock Road, Kentish Town, speed was down to 1mph, taking 33 minutes longer than usual to travel from Brecknock Road to Junction Road in North London.

The M4 motorway near Chiswick was jammed, adding 25 minutes to the drive.

Many roads in central London were running slow, adding 20-35 minutes to travel under two miles.

During the evening rush hour period, follow up statistics at 5.30pm showed 25 per cent of London was at a standstill and 35 per cent of the capital was stuck in heavy traffic, travelling at under 5 mph.

For more information on companies in this article

Related Content

  • Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail
    October 26, 2017
    Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.
  • Data is driving force behind TomTom's intelligent traffic management
    August 23, 2024
    The complexities of modern urban life have put unprecedented strain on transportation infrastructure. Traffic congestion, accidents, and inefficient resource allocation are persistent challenges. However, as Frans Keijzer, Bid Manager EMEA and APAC at TomTom Enterprise explains, a powerful tool has emerged to reshape the way we manage our roads: big data.
  • Gothenburg’s year of congestion charging
    April 9, 2014
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem
  • ITS adaptions enhance cycle safety in Dublin
    December 3, 2013
    Enabled and enforced by innovative use of ITS, Dublin’s new off-road cycle route is proving a hit with commuters, leisure cyclists and walkers alike as Brendan O’Brien explains. Dublin City Council’s vision is to create a city where people of all ages and abilities have the confidence, incentive and facilities to cycle. On-road cycle lanes had already been incorporated into the Quality Bus Corridors design and there is a mix of on- and off-road cycle routes. However, in 2010 the Council began work on a new