Skip to main content

Real-time driving data reveals rush hour congestion on London’s road during tube strike

Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action. According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. Th
February 6, 2017 Read time: 2 mins
Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, 6897 Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action.

According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. There was also 34 per cent heavy traffic, so nearly 60 per cent of total traffic at crawling or worse. Trips took on average 1hr 12 minutes longer than usual to get from Uxbridge to East Acton when approaching city from the West.

Waze says the worst routes included Temple to Trafalgar Square (1 mile) which took 40 minutes (34 minutes more than usual). By comparison, this route should take 13 minutes to walk.

On Brecknock Road, Kentish Town, speed was down to 1mph, taking 33 minutes longer than usual to travel from Brecknock Road to Junction Road in North London.

The M4 motorway near Chiswick was jammed, adding 25 minutes to the drive.

Many roads in central London were running slow, adding 20-35 minutes to travel under two miles.

During the evening rush hour period, follow up statistics at 5.30pm showed 25 per cent of London was at a standstill and 35 per cent of the capital was stuck in heavy traffic, travelling at under 5 mph.

For more information on companies in this article

Related Content

  • London Underground begins search for supplier of 'new Tube for London'
    March 3, 2014
    London Underground (LU) has begun the search for a supplier to build the 'new Tube for London, the next generation of deep-level, energy efficient, walk-through and air-cooled Tube trains. The new trains, capable of full automation, will operate on the Bakerloo, Central, Piccadilly and Waterloo and City line and will enable more frequent and reliable services, boosting capacity and making journeys better and more comfortable for customers. 250 new trains will include air-cooling for the first time on
  • Temporary traffic monitoring with Bluetooth and wi-fi
    May 31, 2013
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech
  • Data clears the road, says TomTom
    July 11, 2025
    Technology is one of the main tools in cutting congestion quickly and effectively. But it can’t just be about making things better for car drivers, explains TomTom’s Andy Marchant…
  • Siemens influences congestion reduction
    March 12, 2021
    When it comes to reducing congestion, even relatively small interventions can have significant and positive knock-on effects, suggests Steve O’Sullivan of Siemens Mobility