Skip to main content

Real-time driving data reveals rush hour congestion on London’s road during tube strike

Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action. According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. Th
February 6, 2017 Read time: 2 mins
Following the warning by London Underground chiefs of tube strikes until lunchtime Wednesday 8 February, 6897 Waze, the real-time crowd-sourced sat nav app, issued data collected during the strike on 9 January to show, for the first time, just how badly London's commuters are affected by strike action.

According to Waze, on 9th January, data at the peak-time 8.05am showed that 24 per cent of traffic was bumper to bumper– effectively standstill; at this time on a normal day it is usually around 12 per cent. There was also 34 per cent heavy traffic, so nearly 60 per cent of total traffic at crawling or worse. Trips took on average 1hr 12 minutes longer than usual to get from Uxbridge to East Acton when approaching city from the West.

Waze says the worst routes included Temple to Trafalgar Square (1 mile) which took 40 minutes (34 minutes more than usual). By comparison, this route should take 13 minutes to walk.

On Brecknock Road, Kentish Town, speed was down to 1mph, taking 33 minutes longer than usual to travel from Brecknock Road to Junction Road in North London.

The M4 motorway near Chiswick was jammed, adding 25 minutes to the drive.

Many roads in central London were running slow, adding 20-35 minutes to travel under two miles.

During the evening rush hour period, follow up statistics at 5.30pm showed 25 per cent of London was at a standstill and 35 per cent of the capital was stuck in heavy traffic, travelling at under 5 mph.

For more information on companies in this article

Related Content

  • M6 should be priority for Government investment, drivers tell FTA
    December 20, 2016
    The Freight Transport Association (FTA) has been looking at stretches of the UK’s strategic road network that would most benefit from Government investment following the Chancellor’s commitment in his Autumn Statement to fund improvements to congestion hot spots. Philip Hammond said the Government would spend IS$1.6 billion (£1.3 billion) on improving England’s roads, including US$222 million (£220 million) on tackling congestion at pinch points and US$33 million (£27 million) on an expressway connecting Ox
  • South west’s first smart motorway opens
    January 15, 2014
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • Two wheels good
    June 25, 2018
    As cycling becomes an increasingly popular method for commuting and recreation, what moves are afoot to keep the growing numbers of cyclists safe on ever-more-busy roads? Alan Dron puts on his helmet and pedals off to look. It would have seemed incredible just a decade ago, but cycling in London has become almost unfeasibly popular. The Transport for London (TfL) June 2017 Strategic Cycling Analysis document noted there were now 670,000 cycle trips a day in the UK capital, an increase of 130% since 2000.
  • A new tube for London
    August 13, 2013
    London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg