Skip to main content

New research assesses potential for driver-assistive truck platooning

The Phase One Final Report of the Driver-Assistive Truck Platooning (DATP) initiative was recently released by the research team. The DATP truck platooning research, which was funded by a grant from the US Department of Transportation's Exploratory Advanced Research program, utilises radar, vehicle-to-vehicle communications and video technologies to decrease over-the-road truck headways, with the objective of improving fuel economy without compromising safety.
May 29, 2015 Read time: 2 mins

The Phase One Final Report of the Driver-Assistive Truck Platooning (DATP) initiative was recently released by the research team.  The DATP truck platooning research, which was funded by a grant from the US Department of Transportation's Exploratory Advanced Research program, utilises radar, vehicle-to-vehicle communications and video technologies to decrease over-the-road truck headways, with the objective of improving fuel economy without compromising safety.

As a core team member of the project, the 5478 American Transportation Research Institute (ATRI) was involved in multiple tasks including the development and assessment of trucking industry user requirements.  It was also the project lead for development of the business case for truck platooning.

Some of the Phase 1 results identified include: Up to 10 percent fuel economy for the trailing truck, and up to 5 percent fuel economy for the leading truck; Truckload and line-haul LTL operations would likely be the greatest beneficiaries of a platooning system, particularly among larger fleets; Fleets and drivers who operate average truck trips of more than 500 miles would experience the highest returns on investment from platooning.

Modellers at Auburn University confirmed that platooning would not negatively impact traffic flows, and could improve traffic flows if truck market penetration reached 60 per cent;

The research also found that platoon formation in some operations appears to be feasible, based on a case study using actual truck movement data from ATRI's truck GPS database; and small fleets and owner-operators required an investment payback period of 10 months, while larger fleets had a mean payback expectation of 18 months.

In Phase 2 of the DATP project, the research team will be conducting both test-track and on-road pilot testing of the system.  In addition, the team will monitor and assess a variety of human factors considerations including driver satisfaction, driver training requirements and driver operational experiences.  The business case analysis will be extended based on these results.

The DATP research team is led by Auburn University and includes ATRI, Bishop Consulting, Peloton Technology, Peterbilt Trucks, and Meritor Wabco.

For more information on companies in this article

Related Content

  • Johns Hopkins takes on transport & climate research for USDoT
    March 10, 2023
    University chosen to lead new transportation centre focused on environmental solutions
  • Phoenix rises to the Smart City challenge
    December 10, 2015
    Andrew Bardin Williams looks at the City of Phoenix where voters backed a $30bn plan to revamp its transportation network to cultivate a more connected community. According to a Land Use Institute study, half of all Americans and even more millennials (63%) would like to live in a place where they do not need to use a car very often. The City of Phoenix is putting in place plans to revamp its urban development and transportation policies to meet these changing quality of life perceptions.
  • Automatic signal control to prevent emergency vehicle collisions?
    March 14, 2012
    Field trials under way in Arizona promise eradication of accidents between emergency vehicles at intersections – as part of a national focus on ‘intelligent signal’ infrastructure. Collisions between police cars, ambulances and fire crews as they reach intersections at the same time, with equal priority given by all signals set on red, are as serious as they sound absurd. For emergency teams and those in need of their help, the consequences are dire. The solution could come from application of connected veh
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency