Skip to main content

Balfour Beatty JV awarded Southern Gateway contract by Texas DOT

Pegasus Link Constructors, a joint venture comprising infrastructure group Balfour Beatty and Fluor Corporation, has been awarded a US$625 million (£484 million) contract to reconstruct and improve the Southern Gateway, an 11 mile stretch of road in Dallas, Texas. The Texas Department of Transportation awarded the contract as part of the Clear Lanes initiative, a programme that prioritises funding for congestion relief projects in Texas’ metropolitan areas. The improvement scheme will improve road-user saf
May 5, 2017 Read time: 1 min
844 Pegasus Link Constructors, a joint venture comprising infrastructure group 3902 Balfour Beatty and 2248 Fluor Corporation, has been awarded a US$625 million (£484 million) contract to reconstruct and improve the Southern Gateway, an 11 mile stretch of road in Dallas, Texas.


The 375 Texas Department of Transportation awarded the contract as part of the Clear Lanes initiative, a programme that prioritises funding for congestion relief projects in Texas’ metropolitan areas.  The improvement scheme will improve road-user safety and relieve congestion for the 180,000 motorists who use the road each day through smoothing and rebuilding existing road elements, enhancing traffic operations and improving entrance and exit ramps. Works include increasing capacity on Interstate 35E south of downtown Dallas, rebuilding the I-35E/US67 interchange and widening the US67 from I-35E to I-20.

Construction is scheduled to start in late 2017 with completion scheduled for 2021.

For more information on companies in this article

Related Content

  • TransCore to develop bay area express lane network
    October 7, 2014
    TransCore is to develop, integrate, and maintain a network of express lanes on behalf of San Francisco’s Metropolitan Transportation Commission’s (MTC) Bay Area Infrastructure Financing Authority (BAIFA). The competitively procured US$54.6 million project will see 90 miles of existing high occupancy vehicle (HOV) converted lanes into express lanes on I-680, I-880 and I-80. The aim is to improve connectivity by closing gaps in the existing HOV network and improve freeway efficiency by making the best use
  • Live demonstrations at 2010 ITS annual meeting
    August 2, 2012
    The practical, day-to-day co-working which goes on at Houston TranStar will form a major part of the demonstrations at the 2010 Annual Meeting, says co-chair of the organising committee Metropolitan Transit Authority of Harris County Chief of Police Thomas C. Lambert.
  • Pollution foiled by foliage
    November 22, 2022
    Living walls provide an innovative solution for reducing air pollution and improving air quality along congested urban highways. Richard Sabin, managing director of Biotecture, explains how
  • Mott MacDonald designed M2M metering scheme begins testing
    December 20, 2017
    Mott MacDonald (MM) has designed a Highways England scheme to smooth traffic flows, reduce queues and to combat eastbound congestion on the M62's junction 10 and 11 as well as traffic joining the motorway from the M6 northbound and southbound link roads. The project will operate during 2018 and be monitored to evaluate the benefits. Called The Motorway to Motorway (M2M) metering pilot scheme, it combines variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62