Skip to main content

American Center for Mobility plans connected vehicle test centre in Michigan

WSP/Parsons Brinckerhoff has been awarded a contract by the American Center for Mobility (ACM) to develop a concept of operations, system requirements, and a procurement strategy for the technology elements of a major new connected and automated vehicle test site facility. The ACM will be built on more than 335 acres adjacent to Willow Run Airport in Ypsilanti, where B-24 bombers were made during World War II in a factory built by Henry Ford. It aims to become a national advanced automotive testing and p
December 20, 2016 Read time: 2 mins
8556 WSP | Parsons Brinckerhoff has been awarded a contract by the American Center for Mobility (ACM) to develop a concept of operations, system requirements, and a procurement strategy for the technology elements of a major new connected and automated vehicle test site facility.

The ACM will be built on more than 335 acres adjacent to Willow Run Airport in Ypsilanti, where B-24 bombers were made during World War II in a factory built by Henry Ford. It aims to become a national advanced automotive testing and product development centre that can accommodate the broad needs of industry and government, test various weather conditions including ice and snow and provide room to grow and adapt as technology dictates. The centre will carry out precautionary testing before vehicles are deployed on the road and provide a proving ground for collaborative safety technology demonstrations. The ACM will also serve as a convening centre to accelerate the development of voluntary standards.

The concept of operations will define requirements for the test facility, including connected vehicle infrastructure, traditional intelligent transportation systems (ITS) technologies, data collection, monitoring and test simulation needs associated with the site.

As the prime consultant, WSP/Parsons Brinckerhoff will coordinate with staff and contractors to develop a complete baseline understanding of the project, identify all user needs, establish a proposed phasing for the site development and coordinate all third party agreements which could impact the design concept. The firm will conduct stakeholder outreach meetings in Southeast Michigan with key stakeholders and customers in order to identify system needs.

Related Content

  • January 19, 2012
    Connected Vehicles test vehicle to vehicle applications
    In the US, the ITS Joint Program Office is about to conduct a series of Driver Clinics intended to gauge public reaction to Connected Vehicle safety technologies and applications. Starting in August, the US Department of Transportation (USDOT) will test Vehicle-to-Vehicle (V2V) applications with everyday drivers in what it describes as 'normal operational scenarios'. These Driver Clinics are being carried out at six locations across the US and together with the subsequent model deployment beginning in 2012,
  • April 23, 2012
    World’s first year-round winter test centre for vehicle and tyre manufacturers
    Test World Oy is building a year-round winter test centre in Finland which will fulfil the needs and demands of vehicle and tyre manufacturers. The first phase of construction will start in next month and this part of the site will be in operation before the end of the year. The three-phase project, which will create a 30,000 m 2 test centre serving vehicle manufacturers and sub-contractors, will be completed by the end of 2015.
  • May 11, 2020
    AVs and poor weather – a bad mix
    The US DoT has produced a report on how adverse weather and road conditions will affect automated vehicles – it found inconsistency between different cars with these features which are already on highways and suggests limitations are not yet understood
  • July 24, 2017
    Truck platooning trials take to the highways
    There is rising enthusiasm in America and beyond for the concept of truck platooning with trials being planned in several US states, as David Crawford reports. Growing numbers of US states are considering or implementing plans for trials of electronically-linked truck platooning on public road networks. This is in response to the interest being shown by the US$70bn a year road freight industry, where fuel represents 41% of the operating costs making the prospect of improving fuel economy by trucks travellin