Skip to main content

ABB delivers 20 EV chargers to Egypt

October 28, 2019 Read time: 1 min

ABB is supplying 20 DC fast chargers across Egypt which it says can recharge electric vehicles (EV) in 15 minutes.

The company says the deployment supports Egypt’s plans to reduce air pollution by 50% by 2023.

The Terra 53 DC fast chargers are being installed at National Petroleum Company gas stations across the country’s road network, car dealerships and busy urban areas.

Each charger comes with ABB Ability connected services, which continuously collects data to remotely monitor and control the operation of the chargers.

 

For more information on companies in this article

Related Content

  • Making connections without compromising security
    November 10, 2017
    We listen in as global experts discuss connected vehicles and cybersecurity. By 2019 there will be almost 44 million connected cars globally and by 2022 that figure will be nearer 70 million; some 40% will be electric powered, according to market analyst Frost & Sullivan. But its report said the issue of end-to-end security for the new technology is still under debate, as vehicle OEMs engage with vendors to test specific security application areas for both over-the-air and vehicle-to-exterior services.
  • US commits $5bn to EV charging network 
    February 18, 2022
    Total available to states in National EV Infrastructure Formula Programme in 2022 is $615m
  • New London development installs EV chargers
    September 9, 2016
    Exemplar, the developer of Fitzroy Place, one of London’s most high-profile and successful new mixed-use developments, has appointed Swarco company Evolt to supply and install 38 single outlet AC wall mount electric vehicle (EV) charge points.
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.