Skip to main content

WSP/Parsons Brinckerhoff to manage California HOV project

The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
October 28, 2016 Read time: 2 mins
The Contra Costa Transportation Authority in California, US, has awarded a contract to 8556 WSP | Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project.

The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound I-680 between Treat Boulevard and Rudgear Road. The existing southbound I-680 HOV lane will be converted to an express lane from Marina Vista to Treat Boulevard and operational improvements will be made to the southbound I-680 express lane between Rudgear Road and El Cerro Boulevard.

As construction manager, WSP/Parsons Brinckerhoff is responsible for a range of services including constructability review, bid management, survey and staking, inspection, schedule analysis, permit monitoring and reporting, quality assurance, material testing, submittal review, and claim and conflict resolution.

The project is scheduled to be completed in June 2020.

Related Content

  • February 27, 2013
    Project of the year win for TransCore Silicon Valley project
    Santa Clara Valley Transportation Authority’s (VTA) State Route (SR) 237 Express Lanes, for which TransCore serves as lead integrator, received the 2012 Transportation Project of the Year Award from the San Francisco Bay Area Institute of Transportation Engineers (ITE). VTA is implementing the Silicon Valley Express Lanes Program to provide congestion relief in one of its major Bay Area commuter corridors. As part of the program, the SR 237, US 101, SR 85 and parts of I-680 corridor will convert the existin
  • February 11, 2014
    Parsons Brinckerhoff JV to design Queensland motorway project
    Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland. The project, worth in excess of US$50m, was awarded by the Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergenc
  • July 7, 2015
    JMT/Parsons Brinckerhoff JV to consult on Maryland bridge replacement
    The Maryland Transportation Authority (MDTA) has selected a joint venture of Johnson, Mirmiran and Thompson (JMT) and Parsons Brinckerhoff as general engineering consultant for the replacement of the Harry W. Nice Memorial Bridge. The bridge, also known as the Potomac River Bridge, is a 1.7-mile (2.7 km), two-lane continuous truss bridge on US 301 that spans the Potomac River between Newburg in Maryland and Dahlgren in Virginia. The US$1 billion programmed budget involves replacing the existing structure
  • October 6, 2014
    Parsons Brinckerhoff to design Cleveland’s pedestrian bridge
    Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland. Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district. The Parsons Brinckerhoff team will develop preliminary plans, includi