Skip to main content

WSP/Parsons Brinckerhoff to manage California HOV project

The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
October 28, 2016 Read time: 2 mins
The Contra Costa Transportation Authority in California, US, has awarded a contract to 8556 WSP | Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project.

The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound I-680 between Treat Boulevard and Rudgear Road. The existing southbound I-680 HOV lane will be converted to an express lane from Marina Vista to Treat Boulevard and operational improvements will be made to the southbound I-680 express lane between Rudgear Road and El Cerro Boulevard.

As construction manager, WSP/Parsons Brinckerhoff is responsible for a range of services including constructability review, bid management, survey and staking, inspection, schedule analysis, permit monitoring and reporting, quality assurance, material testing, submittal review, and claim and conflict resolution.

The project is scheduled to be completed in June 2020.

For more information on companies in this article

Related Content

  • Major setback for California's high speed train
    November 28, 2013
    The future of the California high speed rail project hangs in the balance as a result of two rulings handed down by Sacramento Superior Court Judge Michael Kenny on 25 November. "The judge's ruling will prevent the [California High-Speed Rail] Authority from spending bond measure funds for construction until the funding plan is brought into compliance," said Michael Brady, co- lead attorney on the case, but because that would require finding at least US$25 billion in extra funds, Brady believes complianc
  • Ouster Lidar aids German V2X plans 
    November 3, 2021
    Researchers built 60 mobile measuring stations to be deployed across a 4.3km stretch
  • Transurban and partners host automated and connected vehicle tests
    October 20, 2015
    Transurban recently partnered with Virginia Tech Transportation Institute on their automated and connected vehicle technology road test on the 95 Express Lanes in Northern Virginia. The ten-mile test, part of the Virginia Automated Corridors and Virginia Connected Corridors initiatives, was conducted by the Virginia Tech Transportation Institute, the Virginia Department of Transportation, and Transurban, which operates the Express Lanes. The test took place when the 95 Express Lanes were closed to th
  • Delcan to develop first multi-modal, real-time decision support system in US
    January 27, 2012
    Delcan is to lead the effort to install a new, one of a kind integrated corridor management (ICM) system along a 35-km section of I-15 in San Diego, California. The system will make use of Delcan's Intelligent NETworks product, which will manage multiple modes of transportation and provide a real-time, multimodal decision support system (RTMDSS) that will implement and integrate technologies and concepts that have yet to be used in the United States.