Skip to main content

WSP/Parsons Brinckerhoff to manage California HOV project

The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
October 28, 2016 Read time: 2 mins
The Contra Costa Transportation Authority in California, US, has awarded a contract to 8556 WSP | Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project.

The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound I-680 between Treat Boulevard and Rudgear Road. The existing southbound I-680 HOV lane will be converted to an express lane from Marina Vista to Treat Boulevard and operational improvements will be made to the southbound I-680 express lane between Rudgear Road and El Cerro Boulevard.

As construction manager, WSP/Parsons Brinckerhoff is responsible for a range of services including constructability review, bid management, survey and staking, inspection, schedule analysis, permit monitoring and reporting, quality assurance, material testing, submittal review, and claim and conflict resolution.

The project is scheduled to be completed in June 2020.

For more information on companies in this article

Related Content

  • AECOM and PB JV for Los Angeles regional connector
    April 23, 2012
    The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
  • Iteris makes moves on Seattle & Baton Rouge
    June 21, 2022
    ClearGuide SaaS solution and Vantage Vector detection system are at heart of new deals
  • WSP to acquire Louis Berger in $400m deal
    August 2, 2018
    WSP is set to acquire US international professional services firm Louis Berger in a deal valued $400m. The transaction will add 5,000 employees to WSP and increase its reach in the US, Europe, the Middle East and Latin America. Through the agreement, WSP intends to continue Louis Berger’s restructuring of its international operations and expects to incur $50m in one-time integration and restructuring costs in the coming years. Alexandre L’Heureux, president and chief executive officer of WSP, says the
  • WSP USA designs smart pavement roadway in Colorado pilot
    July 19, 2018
    WSP USA is designing a half-mile section of smart pavement in Colorado in a bid to improve driver safety and vehicle connectivity. The pavement uses sensors to determine a vehicle’s location, direction and speed on US 285 north of Fairplay. The smart pavement was developed by Integrated Roadways and will be implemented as part of an agreement with the Colorado Department of Transportation. Tim Sylvester, founder of Integrated Roadways, says the pavement will collect real-time traffic data, record t