Skip to main content

WSP/Parsons Brinckerhoff to manage California HOV project

The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
October 28, 2016 Read time: 2 mins
The Contra Costa Transportation Authority in California, US, has awarded a contract to 8556 WSP | Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project.

The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound I-680 between Treat Boulevard and Rudgear Road. The existing southbound I-680 HOV lane will be converted to an express lane from Marina Vista to Treat Boulevard and operational improvements will be made to the southbound I-680 express lane between Rudgear Road and El Cerro Boulevard.

As construction manager, WSP/Parsons Brinckerhoff is responsible for a range of services including constructability review, bid management, survey and staking, inspection, schedule analysis, permit monitoring and reporting, quality assurance, material testing, submittal review, and claim and conflict resolution.

The project is scheduled to be completed in June 2020.

For more information on companies in this article

Related Content

  • WSP USA awarded Illinois Tollway system consulting engineer contract
    September 15, 2017
    The Illinois State Toll Highway Authority has appointed WSP USA as the agency’s independent consulting engineer for engineering projects associated with the Illinois Tollway. Under the 54-month contract, WSP will work on a number of current and future tollway projects planned by the Authority. These include the 22-mile Tri-State Tollway Expansion, set to begin design in 2018, the ongoing design and construction of the Elgin O’Hare Western Access Project
  • ACS wins Los Angeles tolling contract
    March 2, 2012
    Affiliated Computer Services (ACS), a Xerox Company, has won a contract to deploy a new electronic toll system on two of the busiest highways in Los Angeles County. The new system will allowing toll rates to change based on traffic levels to help reduce highway congestion on the new 'ExpressLanes'.
  • Florida's high occupancy tolling success in reducing congestion
    July 18, 2012
    TransCore's David Sparks writes about the development of 95 Express, Florida Department of Transportation's new high-occupancy tolling facility. High-Occupancy Tolling (HOT) lanes are one of the most compelling uses of existing transportation infrastructure to expand capacity, particularly in major metropolitan areas which have limited right of way but need to relieve congestion. According to the Federal Highway Administration, while vehicle miles travelled have increased over 70 per cent in the past 20 yea
  • Xerox launches passenger detection system for HOV/HOT lanes
    April 4, 2014
    Recognising that the benefits of high occupancy carpooling lanes are severely limited when motorists do not abide by the rules, Xerox has launched its vehicle passenger detection system, a HOV/HOT lane compliancy test system that uses Xerox video analytics to identify the number of occupants in a vehicle. Unlike competing solutions, the Xerox system identifies the number of occupants in a vehicle with better than 95 per cent accuracy at speeds ranging from stop-go traffic to 100 mph. Using patented vi