Skip to main content

Work to begin on North Virginia highway improvements to ease congestion

Work will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work. Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transp
August 2, 2016 Read time: 2 mins
RSSWork will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The 1747 Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work.

Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transportation Board recently approved a nearly US$10 million program to fund a series of multimodal projects identified by the Northern Virginia Transportation Commission.

Contracts totalling US$60 million were awarded to Fort Myer Construction for tolling infrastructure construction and to 139 TransCore for tolling equipment installation. The project includes eight overhead electronic toll collection gantries on I-66 and approximately 125 signs along I-66 and local roads approaching the highway. The work will require periodic lane closures on local roads approaching I-66 interchanges, ramp closures and night-time lane closures along I-66 itself. Brief, occasional total closures of I-66 will occur during overnight construction to install the overhead gantries. Construction will conclude next year.

In addition to these improvements, a four-mile segment of eastbound I-66 from the Dulles Connector Road to Fairfax Drive will be widened to provide further congestion relief.

The initial project includes the installation of tolling equipment along the Capital Beltway to the Lee Highway exit and signage on local streets approaching the highway. The new I-66 inside the Beltway will be the country’s first roadway with dynamic tolling on all lanes during peak period traffic, keeping traffic moving at highway speeds by adjusting toll prices based on traffic volume.

For more information on companies in this article

Related Content

  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Sao Paulo to launch US$1.1 billion tender for bus infrastructure
    March 26, 2012
    The city council of Sao Paulo in Brazil is to launch a US$1.1 billion tender process to improve its bus capacity. The project will include four new bus lanes, refurbishment works on two existing lanes and the construction of five small bus terminals and two inter-municipal terminals. The current government of Sao Paulo city is envisaging the creation of 66km of bus lanes and the construction of nine bus terminals. Meanwhile, the Governor of Sao Paulo has announced that the works for the extension of the Li
  • Road usage charge pilot under way
    November 22, 2012
    The Oregon Department of Transportation (ODOT) is undertaking a pilot project to test the next generation of a road usage charge system designed to address funding gaps caused by a rise in fuel efficiency and a decline in gas tax revenue. Around forty volunteers have begun testing the new system, where, instead of paying the gas tax, automatically added at the pump, pilot participants will pay a per mile charge based on the number of miles they drive. The charge is roughly equal to the amount of gas tax the
  • South Nevada expands freeway safety tech 
    February 10, 2021
    $6m USDoT grant means US95 will get wrong-way sensors and sensors for HOV lanes