Skip to main content

Work to begin on North Virginia highway improvements to ease congestion

Work will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work. Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transp
August 2, 2016 Read time: 2 mins
RSSWork will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The 1747 Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work.

Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transportation Board recently approved a nearly US$10 million program to fund a series of multimodal projects identified by the Northern Virginia Transportation Commission.

Contracts totalling US$60 million were awarded to Fort Myer Construction for tolling infrastructure construction and to 139 TransCore for tolling equipment installation. The project includes eight overhead electronic toll collection gantries on I-66 and approximately 125 signs along I-66 and local roads approaching the highway. The work will require periodic lane closures on local roads approaching I-66 interchanges, ramp closures and night-time lane closures along I-66 itself. Brief, occasional total closures of I-66 will occur during overnight construction to install the overhead gantries. Construction will conclude next year.

In addition to these improvements, a four-mile segment of eastbound I-66 from the Dulles Connector Road to Fairfax Drive will be widened to provide further congestion relief.

The initial project includes the installation of tolling equipment along the Capital Beltway to the Lee Highway exit and signage on local streets approaching the highway. The new I-66 inside the Beltway will be the country’s first roadway with dynamic tolling on all lanes during peak period traffic, keeping traffic moving at highway speeds by adjusting toll prices based on traffic volume.

For more information on companies in this article

Related Content

  • Cost-effective alternatives to traditional loops
    February 1, 2012
    Traffic signal control is a mainstay of urban congestion management. Despite advances in vehicle detection sensors, inductive loops, which operate by using a magnetic field to detect the metal components in vehicles, are still the most common enabler for intelligent signalised junctions.
  • VDOT launches SmarterRoads transportation data portal for developers
    August 21, 2017
    The Virginia Department of Transportation (VDOT) has launched SmarterRoads, a new cloud based data portal initiative that provides free, widespread access to a range of VDOT information to organisations interested in creating value-added transportation applications and products for end users. SmarterRoads provides direct access to road and transportation information, beyond currently available VDOT traffic operations data, in one portal site.
  • Figures show Express Lanes bring wider benefits
    August 12, 2015
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • Michael Baker International to study traffic congestion in Los Angeles
    February 8, 2017
    Los Angeles County Metropolitan Transportation Authority (Metro) has awarded Michael Baker International a contract to study the I-605/SR-91 interchange, identify improvements and widen a particularly congested three-mile stretch of westbound SR-91 in Los Angeles. The project spans westbound SR-91 from the vicinity of Shoemaker Avenue to the I-605/SR-91 interchange, used by 270,000 vehicles a day. It also includes improvements to the Norwalk, Pioneer and Bloomfield local interchanges within the Gateway