Skip to main content

Work to begin on North Virginia highway improvements to ease congestion

Work will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work. Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transp
August 2, 2016 Read time: 2 mins
RSSWork will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The 1747 Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work.

Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transportation Board recently approved a nearly US$10 million program to fund a series of multimodal projects identified by the Northern Virginia Transportation Commission.

Contracts totalling US$60 million were awarded to Fort Myer Construction for tolling infrastructure construction and to 139 TransCore for tolling equipment installation. The project includes eight overhead electronic toll collection gantries on I-66 and approximately 125 signs along I-66 and local roads approaching the highway. The work will require periodic lane closures on local roads approaching I-66 interchanges, ramp closures and night-time lane closures along I-66 itself. Brief, occasional total closures of I-66 will occur during overnight construction to install the overhead gantries. Construction will conclude next year.

In addition to these improvements, a four-mile segment of eastbound I-66 from the Dulles Connector Road to Fairfax Drive will be widened to provide further congestion relief.

The initial project includes the installation of tolling equipment along the Capital Beltway to the Lee Highway exit and signage on local streets approaching the highway. The new I-66 inside the Beltway will be the country’s first roadway with dynamic tolling on all lanes during peak period traffic, keeping traffic moving at highway speeds by adjusting toll prices based on traffic volume.

Related Content

  • February 1, 2012
    National funding cuts cause fragmentation of US ITS market
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.
  • September 20, 2012
    Developing integrated transport networks
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • January 31, 2012
    Solar-powered traffic detection improves communication
    Pete Goldin reports on a new wireless, solar-powered traffic detection system being used by Caltrans District 12. As more and more traffic data is necessary to satisfy the needs of traffic management centres and traveller information systems, and as traffic detection technology becomes more ubiquitous, transportation authorities are pressured to find more economical ways of expanding their detection systems. Caltrans District 12 is leading this push by deploying the latest detection system from Case Global
  • April 17, 2013
    TransCore to provide AET forOrange County toll roads
    Toll roads in Orange County California are due to go cashless and all-electronic (AET) in the spring of 2014 according to an announcement from the Transportation Corridors Agencies (TCA) which has just has just approved a contracts with TransCore. The contract is for US$36.42 million and provides for provision of a new toll system that is regular AET mix of RFID transponder tolling and image based licence plate reads in an open road setting. TransCore will also maintain the system for ten years. A statement