Skip to main content

Work to begin on North Virginia highway improvements to ease congestion

Work will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work. Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transp
August 2, 2016 Read time: 2 mins
RSSWork will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The 1747 Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work.

Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transportation Board recently approved a nearly US$10 million program to fund a series of multimodal projects identified by the Northern Virginia Transportation Commission.

Contracts totalling US$60 million were awarded to Fort Myer Construction for tolling infrastructure construction and to 139 TransCore for tolling equipment installation. The project includes eight overhead electronic toll collection gantries on I-66 and approximately 125 signs along I-66 and local roads approaching the highway. The work will require periodic lane closures on local roads approaching I-66 interchanges, ramp closures and night-time lane closures along I-66 itself. Brief, occasional total closures of I-66 will occur during overnight construction to install the overhead gantries. Construction will conclude next year.

In addition to these improvements, a four-mile segment of eastbound I-66 from the Dulles Connector Road to Fairfax Drive will be widened to provide further congestion relief.

The initial project includes the installation of tolling equipment along the Capital Beltway to the Lee Highway exit and signage on local streets approaching the highway. The new I-66 inside the Beltway will be the country’s first roadway with dynamic tolling on all lanes during peak period traffic, keeping traffic moving at highway speeds by adjusting toll prices based on traffic volume.

Related Content

  • November 12, 2018
    Conduent to provide tolling system to ease congestion in Los Angeles
    Conduent Transportation is to modernise the tolling system on ExpressLanes in Los Angeles County to help reduce congestion and improve safety along the I-10 and I-110 corridors. The eight-year contract is an extension to a six-year partnership with the Los Angeles County Metropolitan Authority (LA Metro). The scope of the project includes the installation of overhead scanners and automatic vehicle identification equipment which corresponds with the FasTrak transponders installed on commuter vehicles.
  • September 19, 2014
    India to deploy ETC at 82 toll plazas
    Established in 2011, Indian technology and infrastructure company Vaaan has been awarded two major projects valued at around US$25 million from the National Highways Authority of India (NHAI) through its highway operations management agency, Indian Highways Management Company (IHMCL). The company is to deploy electronic toll collection (ETC) on 164 dedicated lanes across 82 public funded toll plazas in a bid to to reduce traffic congestion and commuting time. In addition, in a move to identify which h
  • May 11, 2017
    Pricing practise for HOT lane operation
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure
  • October 29, 2012
    Project to ease traffic on Interstate 80 unveiled
    California’s regional transportation officials are taking a comprehensive approach to relieving clogged arteries that affect the health of commuters and cities along a 22-mile stretch of the Interstate 80 corridor from the Carquinez Bridge to the MacArthur Maze.