Skip to main content

Work to begin on North Virginia highway improvements to ease congestion

Work will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work. Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transp
August 2, 2016 Read time: 2 mins
RSSWork will begin this summer on the first major improvements to US Interstate 66 inside the Capital Beltway, Virginia, in 15 years. The 1747 Virginia Department of Transportation (VDOT) project is part of a comprehensive initiative to transform the I-66 corridor, giving commuters and other travellers a variety of fast and reliable choices for getting to and from work.

Toll revenues will fund multimodal improvements, giving commuters expanded options for travel. To jumpstart the process, the Commonwealth Transportation Board recently approved a nearly US$10 million program to fund a series of multimodal projects identified by the Northern Virginia Transportation Commission.

Contracts totalling US$60 million were awarded to Fort Myer Construction for tolling infrastructure construction and to 139 TransCore for tolling equipment installation. The project includes eight overhead electronic toll collection gantries on I-66 and approximately 125 signs along I-66 and local roads approaching the highway. The work will require periodic lane closures on local roads approaching I-66 interchanges, ramp closures and night-time lane closures along I-66 itself. Brief, occasional total closures of I-66 will occur during overnight construction to install the overhead gantries. Construction will conclude next year.

In addition to these improvements, a four-mile segment of eastbound I-66 from the Dulles Connector Road to Fairfax Drive will be widened to provide further congestion relief.

The initial project includes the installation of tolling equipment along the Capital Beltway to the Lee Highway exit and signage on local streets approaching the highway. The new I-66 inside the Beltway will be the country’s first roadway with dynamic tolling on all lanes during peak period traffic, keeping traffic moving at highway speeds by adjusting toll prices based on traffic volume.

Related Content

  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • May 1, 2025
    Three for Q-Free in the US
    Kinetic Mobility will be used in Denver, Washington DC and Dallas-Fort Worth
  • December 4, 2014
    Barriers tailor-made for Swedish motorway project
    Traffic management barriers developed by Belgian access control systems are being used on the Norra Länken motorway project in Sweden, supplied through its local partner Swarco. Built in cooperation with the city of Stockholm and co-financed by the European Union, Norra Länken is five kilometres long with four kilometres in tunnels and is said to be northern Europe’s largest road tunnel project. Two types of barrier have been installed on the project, the BL77 security barrier and the extra long BL52
  • February 2, 2012
    Active traffic management increases safety and capacity
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates