Skip to main content

Washington State Road Charge Pilot Project – request for proposals

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.
June 2, 2017 Read time: 2 mins

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.

D’Artagnan requests proposals from firms who wish to be considered for the following functions:

Provision of the operational concepts selected by WSTC, including: automated distance charge (with general location); automated distance charge (without location); mileage permit and odometer charge.

Collectively, across two proposers, provision of supporting mileage-reporting technologies for automated distance charge and odometer-based operational concepts: OBDII device (with and without general location) and Smartphone app to report and transmit mileage data to a RUC account manager for verification and calculation of the RUC owed.

Washington Department of Licensing (DOL) subagents will provide manual reporting of participant odometers via visual inspection and/or smartphone apps. This is not sought to be provided by account managers, but at least one account manager must be capable of receiving odometer data from subagents.

The Proposal Due Date is 5:00 p.m. Pacific Time on Monday, June 19, 2017. The RFP file is also available to interested parties in providing the above services or technologies by emailing D’Artagnan.

Related Content

  • Austrian Bike2CAV V2X project could mark turning point in cyclist safety
    May 10, 2023
    Research in Salzburg into C-ITS equips bikes with V2X tech to allow detection via ITS-G5
  • Full analysis: Massive US EV infrastructure plan
    February 21, 2023
    The White House has announced a huge financial boost, new standards, and major progress for a made-in-America national network of EV chargers to support the future of US EV charging
  • Smart Spanish city trials cell-based traffic management
    November 7, 2013
    David Crawford reports on an urban electronic nervous system. The northern Spanish city of Santander – historically a port - is now an emerging technology showcase attracting global attention as a prototype for a medium-sized smart city of the future. In a move to determine the optimal use of available data, it is creating a de-facto experimental laboratory for sensor and mobile phone-based urban traffic management and environmental monitoring innovations.
  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab