Skip to main content

Washington State Road Charge Pilot Project – request for proposals

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.
June 2, 2017 Read time: 2 mins

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.

D’Artagnan requests proposals from firms who wish to be considered for the following functions:

Provision of the operational concepts selected by WSTC, including: automated distance charge (with general location); automated distance charge (without location); mileage permit and odometer charge.

Collectively, across two proposers, provision of supporting mileage-reporting technologies for automated distance charge and odometer-based operational concepts: OBDII device (with and without general location) and Smartphone app to report and transmit mileage data to a RUC account manager for verification and calculation of the RUC owed.

Washington Department of Licensing (DOL) subagents will provide manual reporting of participant odometers via visual inspection and/or smartphone apps. This is not sought to be provided by account managers, but at least one account manager must be capable of receiving odometer data from subagents.

The Proposal Due Date is 5:00 p.m. Pacific Time on Monday, June 19, 2017. The RFP file is also available to interested parties in providing the above services or technologies by emailing D’Artagnan.

Related Content

  • May 5, 2021
    McKinsey reveals the $bns spent on mobility
    Investors have poured nearly $330bn into more than 2,000 mobility firms since 2010
  • January 3, 2017
    ITS World Congress 2017 call for demos
    As part of the Montréal World Congress 2017, conference organizers are planning to feature live demonstrations of ITS technologies. The city of Montréal will create a virtual test bed on the streets adjacent to the Convention Centre. This test bed will include an arterial loop circling the Centre and a section of a nearby limited access highway that will be equipped with DSRC roadside units integrated with local signal controllers to support demonstrations of connected vehicle technologies. In order to a
  • July 27, 2012
    EV charging station market in the US has grown immensely
    New analysis from Frost & Sullivan says that the electric vehicle (EV) charging station market in North America has grown immensely, helped along by favourable government level (federal, state and municipal) incentives and subsidies for the purchase of EVs. The government is extending these plans to the installation of charging station and funding programmes such as ECOtality's EV project, which is trying to install electric vehicle charging infrastructure in six major states.
  • June 16, 2025
    Rwanda's mobility plan in seven junctions
    ITS improvements at just seven intersections could be the key to improving transportation in Rwanda’s capital, Kigali: Shem Oirere reports from East Africa