Skip to main content

Washington State Road Charge Pilot Project – request for proposals

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.
June 2, 2017 Read time: 2 mins

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.

D’Artagnan requests proposals from firms who wish to be considered for the following functions:

Provision of the operational concepts selected by WSTC, including: automated distance charge (with general location); automated distance charge (without location); mileage permit and odometer charge.

Collectively, across two proposers, provision of supporting mileage-reporting technologies for automated distance charge and odometer-based operational concepts: OBDII device (with and without general location) and Smartphone app to report and transmit mileage data to a RUC account manager for verification and calculation of the RUC owed.

Washington Department of Licensing (DOL) subagents will provide manual reporting of participant odometers via visual inspection and/or smartphone apps. This is not sought to be provided by account managers, but at least one account manager must be capable of receiving odometer data from subagents.

The Proposal Due Date is 5:00 p.m. Pacific Time on Monday, June 19, 2017. The RFP file is also available to interested parties in providing the above services or technologies by emailing D’Artagnan.

Related Content

  • June 15, 2017
    Modelling MaaS and making it happen
    Colin Sowman looks at some of the emerging technology being introduced to evaluate and operate Mobility as a Service. The fast-growing interest in Mobility-as-a-Service (MaaS) has prompted the creation of a host of software systems for those wanting to become a MaaS provider or participate in MaaS offerings. Most recently, at ITS International’s MaaS Market conference, Portuguese company Brisa Innovation announced a name change to A-to-Be to reflect its increasing involvement in the MaaS sector with the lau
  • February 16, 2021
    Best practices in road asset management
    Vaisala's webinar on 25 February looks at an Ontario region using geospatial video
  • January 25, 2012
    US state of the art workzone safety
    The Texas Transportation Institute's Jerry Ullman talks about the state of the art in work zone safety in the US. Work zones are places where, perhaps more than anywhere else on the road network, mobility and safety are strongly linked. Historically, field crews and contractors wanted vehicles in work zones to be moving as slowly as possible, assuming that made conditions the safest for work crews. We are though starting to see a shift in such thinking with the realisation that excessive delays or slow-down
  • April 30, 2024
    Hard data supports traffic monitoring
    A collaboration between AGD Systems and North Line Canada has demonstrated the value of traffic experts putting their heads together to improve pedestrian safety