Skip to main content

Washington State Road Charge Pilot Project – request for proposals

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.
June 2, 2017 Read time: 2 mins

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.

D’Artagnan requests proposals from firms who wish to be considered for the following functions:

Provision of the operational concepts selected by WSTC, including: automated distance charge (with general location); automated distance charge (without location); mileage permit and odometer charge.

Collectively, across two proposers, provision of supporting mileage-reporting technologies for automated distance charge and odometer-based operational concepts: OBDII device (with and without general location) and Smartphone app to report and transmit mileage data to a RUC account manager for verification and calculation of the RUC owed.

Washington Department of Licensing (DOL) subagents will provide manual reporting of participant odometers via visual inspection and/or smartphone apps. This is not sought to be provided by account managers, but at least one account manager must be capable of receiving odometer data from subagents.

The Proposal Due Date is 5:00 p.m. Pacific Time on Monday, June 19, 2017. The RFP file is also available to interested parties in providing the above services or technologies by emailing D’Artagnan.

Related Content

  • June 6, 2017
    US DOTs to use Inrix travel time data to report on road performance
    From July 2017, Inrix is to provide its traffic data to the United States Federal Highway Administration (FHWA) and state and regional agencies to enable them to assess travel reliability, congestion and emissions, establish performance targets and report on progress.
  • February 24, 2016
    Shaking up the taxi market with smarter ride requests
    Timothy Compston looks at the rise of Uber and ride request mobile apps. There is little doubt that the advent of Uber has come as major shock to established taxi operators and has caused regulators, cities and DOTs to rethink current regulations so they can keep pace with the changing dynamics of the marketplace.
  • December 16, 2022
    Kistler’s smooth ride on Caltrans info highway
    Caltrans needed a solution to boost its outmoded traffic monitoring capability. Kistler’s KiTraffic Statistics met the California agency’s stringent requirements. And then came Covid…
  • April 11, 2014
    PennDOT open for unsolicited P3 transportation proposals
    The Pennsylvania Department of Transportation (PennDOT) Office of Public-Private Partnerships (P3) has announced that it is accepting unsolicited proposals for transportation projects from the private sector until 30 April. The submission period applies to PennDOT-owned projects and infrastructure. During this period, the private sector can submit proposals offering innovative ways to deliver transportation projects across a variety of modes including roads, bridges, rail, aviation and ports. Proposals c