Skip to main content

Washington State Road Charge Pilot Project – request for proposals

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.
June 2, 2017 Read time: 2 mins

The Washington Transportation Commission (WSTC) has retained D’Artagnan Consulting as the prime contractor to assist with formulation, design, management and implementation of the Washington Road Usage Charge Pilot Project. This pilot project will demonstrate and evaluate an operational road usage charge system with a minimum of 2000 volunteers for a period of 12 months, expected to begin in January 2018.

D’Artagnan requests proposals from firms who wish to be considered for the following functions:

Provision of the operational concepts selected by WSTC, including: automated distance charge (with general location); automated distance charge (without location); mileage permit and odometer charge.

Collectively, across two proposers, provision of supporting mileage-reporting technologies for automated distance charge and odometer-based operational concepts: OBDII device (with and without general location) and Smartphone app to report and transmit mileage data to a RUC account manager for verification and calculation of the RUC owed.

Washington Department of Licensing (DOL) subagents will provide manual reporting of participant odometers via visual inspection and/or smartphone apps. This is not sought to be provided by account managers, but at least one account manager must be capable of receiving odometer data from subagents.

The Proposal Due Date is 5:00 p.m. Pacific Time on Monday, June 19, 2017. The RFP file is also available to interested parties in providing the above services or technologies by emailing D’Artagnan.

Related Content

  • Intertraffic Mexico 2017 will emphasize tomorrow’s mobility challenges
    November 14, 2017
    Over 5,000 industry professionals are expected to attend the second edition of Intertraffic Mexico, held in Citibanamex from 15-17 November 2017. Exhibitors from 47 countries will showcase their latest products and solutions within infrastructure, traffic management, parking, safety and smart mobility. It is set to highlight the best practises from the mobility industry with 180 companies on the show floor. Organised by RAI Amsterdam and E.J. Krause Tarsus de Mexico (KTdM), the event stimulates the
  • Sustainable mobility: innovative solutions needed to reduce traffic emissions
    May 1, 2021
    Kapsch TrafficCom’s Mobility Report 2021 reveals how new ITS measures such as vehicle connectivity and AI-based data processing can help create joined-up traffic management
  • Norway gets ready for more EVs
    September 14, 2021
    Norway’s road transport network is changing radically. The country is gearing up for greater electric vehicle use as well as gradually phasing out its traditional ferry links
  • TomTom provides flexibility for Riyadh
    June 1, 2016
    With five years of traffic disruption ahead and an inadequate traffic monitoring system, the authorities in Riyadh needed a solution – and quickly. In preparation for embarking on what is currently the world’s largest metro construction project, the Arriyadh Development Authority (ADA) in Riyadh needed to put in place measures to minimise the additional congestion and travel delays the five-year project would inevitably cause.