Skip to main content

Washington I-90 tolling could start in 2015

A planned Washington Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable. Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of toll
January 2, 2013 Read time: 3 mins
A planned 451 Washington State Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable.

Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of tolling on I-90 between interstate 5 and interstate 405.

“What we will be doing early in 2013 is studying the tolling of I-90,” said Craig Stone, assistant secretary for the WSDOT toll division.

A WSDOT-proposed time line of the study has planned public scoping meetings in early 2013 and a complete environmental impact study by early 2014, which could then allow approval of potential tolls in 2014. The state could then begin collecting the charge in 2015 or 2016.

The overall cost of the 520 replacement project is estimated at US$4.128 billion, a decline from US$4.6 billion, but the state still needs to find US$1.4 billion. Meanwhile, WSDOT's Stone said at a Mercer Island public meeting last month that congestion has increased on Interstate 5, Interstate 90 and State Route 522 as drivers avoid tolls on SR 520.

Traffic on I-90 has increased, on average, 13 percent over pre-520 toll levels, and I-90 travel times are three minutes longer on average during the peaks, said Stone. The state can't afford to come up with the rest of the money by asking the federal government for earmarks.  "The days of 90 percent of federal dollars coming in to finance highways in our state are basically over," he said.

WSDOT spokesperson Michell Mouton pledged that no decision has yet been made on whether or not to toll I-90. But the transportation agency must carry out the wishes of the state legislature, which s them to perform an environmental assessment and engage the public in communities that border Lake Washington.  "It's not just tolling for tolling's sake," she said. "We have to look at tolling on I-90 to help with the 520 floating bridge ... one affects the other. People will have the opportunity to engage and provide input to the study.  We're looking at tolling as a strategy."

Mouton also said that no decision had been made on changing access to high occupancy vehicle (HOV) lanes to and from Mercer Island, which currently allow single-occupancy vehicle access on the I-90 express lanes.

For more information on companies in this article

Related Content

  • Big data analytics identifies congestion increases
    November 26, 2014
    Iteris has completed and published the Alameda County Transportation Commission (Alameda CTC) 2014 Level of Service Monitoring Report. The report was generated for speed-based congestion monitoring, utilising big data analytics in place of conventional in-field manual data collection for 205 miles of the 327 mile network. Use of big data analytics will be expanded in future monitoring cycles. Many agencies conduct congestion monitoring through manual data collection efforts. Agencies traditionally us
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • Overcoming the toll fatigue paradox
    July 17, 2025
    Why does the most transparent funding mechanism – the simplest, clearest and most intuitively logical – face the strongest public resistance? Tim McGuckin ponders the reasons…
  • Emovis’ 5-step guide to educating drivers on road usage charging
    October 31, 2023
    If people don’t understand the benefits of road usage charging, then it is unlikely to have public support. Scott Jacobs of Emovis outlines ways in which key messages – particularly on fairness - can be put across