Skip to main content

Washington I-90 tolling could start in 2015

A planned Washington Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable. Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of toll
January 2, 2013 Read time: 3 mins
A planned 451 Washington State Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable.

Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of tolling on I-90 between interstate 5 and interstate 405.

“What we will be doing early in 2013 is studying the tolling of I-90,” said Craig Stone, assistant secretary for the WSDOT toll division.

A WSDOT-proposed time line of the study has planned public scoping meetings in early 2013 and a complete environmental impact study by early 2014, which could then allow approval of potential tolls in 2014. The state could then begin collecting the charge in 2015 or 2016.

The overall cost of the 520 replacement project is estimated at US$4.128 billion, a decline from US$4.6 billion, but the state still needs to find US$1.4 billion. Meanwhile, WSDOT's Stone said at a Mercer Island public meeting last month that congestion has increased on Interstate 5, Interstate 90 and State Route 522 as drivers avoid tolls on SR 520.

Traffic on I-90 has increased, on average, 13 percent over pre-520 toll levels, and I-90 travel times are three minutes longer on average during the peaks, said Stone. The state can't afford to come up with the rest of the money by asking the federal government for earmarks.  "The days of 90 percent of federal dollars coming in to finance highways in our state are basically over," he said.

WSDOT spokesperson Michell Mouton pledged that no decision has yet been made on whether or not to toll I-90. But the transportation agency must carry out the wishes of the state legislature, which s them to perform an environmental assessment and engage the public in communities that border Lake Washington.  "It's not just tolling for tolling's sake," she said. "We have to look at tolling on I-90 to help with the 520 floating bridge ... one affects the other. People will have the opportunity to engage and provide input to the study.  We're looking at tolling as a strategy."

Mouton also said that no decision had been made on changing access to high occupancy vehicle (HOV) lanes to and from Mercer Island, which currently allow single-occupancy vehicle access on the I-90 express lanes.

For more information on companies in this article

Related Content

  • Fitch: Smooth ride so far for US managed lanes
    March 9, 2017
    Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review. Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound a
  • Transition to all electronic tolling leads to cost savings
    February 2, 2012
    How a temporary congestion-relief solution resulted in the North Texas Tollway Authority's transition to all-electronic toll collection and potential savings of up to $472 million by 2045. By Carla Kienast, ETC Corporation
  • ARTBA proposes path to breaking gridlock on transportation funding
    March 13, 2015
    The American Road & Transportation Builders Association (ARTBA) has outlined a detailed proposal it believes could end the political impasse over how to fund future federal investments in state highway, bridge and transit capital projects. The ‘Getting beyond gridlock’ plan would marry a 15 cents-per-gallon increase in the federal gas and diesel motor fuels tax with a 100 per cent offsetting federal tax rebate for middle and lower income Americans for six years. The plan, ARTBA says, would fund a US$401 bil
  • USDoT looks at the costs and potential benefits of connected vehicles
    October 26, 2017
    David Crawford looks at latest lessons learned from the trials of connected vehicles in the US. The progress of connected vehicle (CV) technologies takes centre stage among the hot topics highlighted in the September 2017 edition – the first since 2014 – of the ‘ITS Benefits, Costs and Lessons Learned’ survey from the US ITS Joint Program Office (JPO). The organisation is an arm of the US Department of Transportation (USDoT).