Skip to main content

Victorian Government to fund second river crossing

The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
April 18, 2016 Read time: 2 mins
The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding.

Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045.

The Government and Transurban in Australia have now signed an agreement on processes for the tender, planning and engagement stages and announced the establishment of the Western Distributor Authority to get the project completed.

They have also released the first full designs which include two options for connecting the West Gate Freeway to the Western Distributor Tunnel, either directly within the road reserve, or via ramps to a portal in adjacent land.

Key features include: a tunnel under Yarraville and a second river crossing over the Maribyrnong; the longest managed motorway system in Australia from Geelong to Pakenham; 4.5km of new cycling and pedestrian paths including completion of the Federation Trail; Widening the Monash Freeway in two places.

To get dangerous goods trucks, which can’t travel in a tunnel, out of residential streets, the designs include five ramp options to connect the West Gate Freeway directly to Hyde Street.

Related Content

  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • September 22, 2014
    FTA disappointed at Dartford free-flow toll delay
    ‘The delay of the introduction of free-flow tolls at Dartford River Crossing disappointing as it may present additional costs to industry’ is the message from the Freight Transport Association (FTA). The Association has voiced its concern in response to the announcement by the Highways Agency (HA) that the planned technology to allow motorists to use the crossing without having to stop at barriers and pay is to be delayed by up to four weeks. Originally planned to be in place by the 28 October 2014, th
  • March 16, 2017
    Canada looks to HOT lanes to tackle congestion
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • June 30, 2017
    Government publishes programme of upgrades to major roads and motorways
    The UK government has unveiled a US$8 billion (£6.1 billion) programme of road improvements as part of its US$30 billion (£23 billion) upgrade to the road network in England.