Skip to main content

Victorian Government to fund second river crossing

The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
April 18, 2016 Read time: 2 mins
The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding.

Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045.

The Government and Transurban in Australia have now signed an agreement on processes for the tender, planning and engagement stages and announced the establishment of the Western Distributor Authority to get the project completed.

They have also released the first full designs which include two options for connecting the West Gate Freeway to the Western Distributor Tunnel, either directly within the road reserve, or via ramps to a portal in adjacent land.

Key features include: a tunnel under Yarraville and a second river crossing over the Maribyrnong; the longest managed motorway system in Australia from Geelong to Pakenham; 4.5km of new cycling and pedestrian paths including completion of the Federation Trail; Widening the Monash Freeway in two places.

To get dangerous goods trucks, which can’t travel in a tunnel, out of residential streets, the designs include five ramp options to connect the West Gate Freeway directly to Hyde Street.

Related Content

  • September 14, 2021
    Norway gets ready for more EVs
    Norway’s road transport network is changing radically. The country is gearing up for greater electric vehicle use as well as gradually phasing out its traditional ferry links
  • June 12, 2023
    How to outsmart the rat runners - use data
    Proactively solving transport problems with powerful empirical evidence is appealing: Emily Bobis of Compass IoT explains how vehicle-generated data can be the missing link
  • June 6, 2014
    App informs drivers of delays during Long Beach bridge replacement
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • January 27, 2012
    Ramp metering delivers - again
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to