Skip to main content

Victorian Government to fund second river crossing

The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
April 18, 2016 Read time: 2 mins
The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding.

Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045.

The Government and Transurban in Australia have now signed an agreement on processes for the tender, planning and engagement stages and announced the establishment of the Western Distributor Authority to get the project completed.

They have also released the first full designs which include two options for connecting the West Gate Freeway to the Western Distributor Tunnel, either directly within the road reserve, or via ramps to a portal in adjacent land.

Key features include: a tunnel under Yarraville and a second river crossing over the Maribyrnong; the longest managed motorway system in Australia from Geelong to Pakenham; 4.5km of new cycling and pedestrian paths including completion of the Federation Trail; Widening the Monash Freeway in two places.

To get dangerous goods trucks, which can’t travel in a tunnel, out of residential streets, the designs include five ramp options to connect the West Gate Freeway directly to Hyde Street.

Related Content

  • May 16, 2017
    Smart motorway planned for Western Australia
    In a bid to reduce high levels of congestion on the Kwinana Freeway near Perth in Western Australia, the government is planning to introduce a smart motorway by converting the emergency stopping lane to a full-time running lane. The concept is similar to the smart motorways in use in the UK which use variable speed limits during busy times to manage congestion. The US$25 million (AU$47 million) project is expected to start in 2018-2019 and will also include: in-road detectors and full CCTV coverage to provi
  • October 21, 2014
    London’s strategy to tackle air quality problems
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • June 26, 2018
    Managed lane operators: meet the CAV pioneers
    There is some controversy over the testing of connected and autonomous vehicles – but Robert Deans of Transurban North America explains how managed lanes could be vital in the development of CAVs, benefiting everyone. Managed lane operators have the opportunity to establish themselves as leaders in the testing and roll-out of connected and automated vehicles (CAVs), assisting and accelerating the transition of CAVs onto road networks to deliver economic and safety benefits. Managed lane facilities
  • August 23, 2016
    Asecap debates the future of tolling
    Colin Sowman reports form Asecap’s Study & Information Days event in Madrid. At Asecap’s (the Association of European Toll Road Operators) recent Study and Information Days event there was no doubt about the subject at the top of the agenda: the European Union Directive 23/2014/EU. This will introduce fundamental changes to the concession model under which Asecap members operate more than 50,000km of tolled highways and, in response, it has compiled a report entitled Proposal for a Sustainable Concession Mo