Skip to main content

Victorian Government to fund second river crossing

The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
April 18, 2016 Read time: 2 mins
The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding.

Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045.

The Government and Transurban in Australia have now signed an agreement on processes for the tender, planning and engagement stages and announced the establishment of the Western Distributor Authority to get the project completed.

They have also released the first full designs which include two options for connecting the West Gate Freeway to the Western Distributor Tunnel, either directly within the road reserve, or via ramps to a portal in adjacent land.

Key features include: a tunnel under Yarraville and a second river crossing over the Maribyrnong; the longest managed motorway system in Australia from Geelong to Pakenham; 4.5km of new cycling and pedestrian paths including completion of the Federation Trail; Widening the Monash Freeway in two places.

To get dangerous goods trucks, which can’t travel in a tunnel, out of residential streets, the designs include five ramp options to connect the West Gate Freeway directly to Hyde Street.

Related Content

  • February 16, 2015
    Melbourne metro funding fast-tracked
    Work has begun on one of Australia’s largest infrastructure projects: two nine-kilometre underground rail tunnels that will transform Melbourne’s public transport system. The Victoria government has fast-tracked US$31 million to establish the Melbourne Metro Rail Authority and start work on the project as soon as possible. The project also includes five new underground stations. The Authority will oversee immediate planning works, complete development of the reference design and undertake detailed site inve
  • October 21, 2016
    Caltrans takes the long view of transport
    Caltrans’ Malcolm Dougherty took time out of his schedule at ITS America 2016 in San Jose to talk to ITS International about current and future challenges. As director of California Department of Transportation (Caltrans) since mid-2012, many would say that Malcolm Dougherty has one of the best jobs in transportation. Caltrans is one of the most progressive and innovative transport authorities, implementing policies to encourage cycling, piloting new
  • January 27, 2012
    Integrated command and control solution for UK tunnel
    UK company Sicura Systems is supplying a fully fault-tolerant, integrated command and control solution to the US$416 million New Tyne Crossing project on the A19 near Newcastle in England.
  • October 22, 2014
    Smoothing the path to reducing traffic pollution
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.