Skip to main content

TransCore to upgrade over 300 toll lanes in central Florida

The Central Florida Expressway Authority (CFX) has awarded TransCore a US$85 million project to design, install and maintain a new, innovative electronic toll collection system for over 300 toll lanes, as part of an ongoing initiative to improve its transportation management system. TransCore will upgrade the system with its Infinity Digital Lane System, which consists of independent modules that can be easily replaced, upgraded or removed in the field without affecting lane operations, reducing long-ter
October 14, 2015 Read time: 2 mins
The Central Florida Expressway Authority (CFX) has awarded 139 TransCore a US$85 million project to design, install and maintain a new, innovative electronic toll collection system for over 300 toll lanes, as part of an ongoing initiative to improve its transportation management system.

TransCore will upgrade the system with its Infinity Digital Lane System, which consists of independent modules that can be easily replaced, upgraded or removed in the field without affecting lane operations, reducing long-term maintenance costs.

As part of the technology upgrade, TransCore will integrate its advanced vehicle classification and identification systems combined with a digital video audit module to enhance the system’s precision and auditability.

TransCore will also establish a maintenance monitoring centre that tracks system performance in real time, 24 hours a day, 365 days a year. This online maintenance and inventory control system has the ability to monitor, respond to and prevent equipment issues before they occur.

The multi-phased toll system upgrade is scheduled to be completed in 2018 with minimal impact to expressway users. It is expected to improve the accuracy and reliability of the system used to collect and manage toll transactions that occur at 86 toll plazas and along 109 miles of expressways throughout the metro-Orlando area.

“We fully support the Central Florida Expressway Authority’s goals to provide a system that can easily adapt to the growing needs of one of the country’s most popular destinations,” said Jim Wilson, TransCore’s senior vice president and project principal.

Related Content

  • February 25, 2015
    San Francisco plans express lane network across Bay Area
    Colin Sowman looks at plans to convert 240km (150 miles) of HOV/car pool lanes. While some authorities have debated the conversion of high occupancy vehicle lanes (HOV) into express or managed lanes allowing toll paying single-occupant vehicles to avoid congestion, San Francisco’s Bay Area Metropolitan Transportation Commission (MTC) has acted. It is converting 240km (150 miles) of HOV/car pool lanes to express lanes and last fall the MTC’s Bay Area Infrastructure Financing Authority selected TransCore to d
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • April 25, 2012
    TransCore wins three ITS contracts from Nevada DOT
    TransCore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.
  • February 1, 2012
    No in-road equipment for Queensland's free flow toll bridge
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.