Skip to main content

TransCore develops nearly 100 miles of express lanes in Dallas/Fort Worth

TransCore is in the midst of deploying over 100 miles of express lanes throughout the Dallas/Fort Worth Metroplex, as part of an initiative to increase mobility along the region’s busiest corridors. With 34 lanes already operational, the Texas Department of Transportation (TxDOT) plans to mark the 100-mile milestone by the end of 2018.
November 8, 2016 Read time: 2 mins

139 TransCore is in the midst of deploying over 100 miles of express lanes throughout the Dallas/Fort Worth Metroplex, as part of an initiative to increase mobility along the region’s busiest corridors. With 34 lanes already operational, the Texas Department of Transportation (TxDOT) plans to mark the 100-mile milestone by the end of 2018.

TransCore has completed construction of the area’s first fully-automated, reversible direction open road tolling system along I-30, a major east-west corridor that spans Arlington, Grand Prairie, and Dallas, which includes 16 miles of dynamically-priced managed lanes, of which 7.6 miles are reversible to better accommodate heavier traffic during peak travel times. As part of the implementation, TransCore also provided a Managed Lane Dashboard enabling TxDOT to remotely monitor and manually control incidents, as they arise.

In August, TransCore completed nearly 10 miles of high occupancy vehicle express lanes along I-635 just east of downtown Dallas, connecting US 75 to I-30.

Construction continues on the I-35E managed lanes running north/south from Farmers Branch to Denton. The managed lanes will include nine toll zones, five of which will be reversible.

TransCore also continues construction of nearly 30 miles of managed lanes along State Highway 114 north of Irving and SH 183 east of Euless. Known as the Midtown Express, this project adds one new managed toll lane in each direction in some locations along both corridors. The Midtown Express managed lanes are expected to be completed in 2018.

In 2014, TransCore completed four miles of managed lanes on the DFW Connector along State Highway 114 in Grapevine.

All toll locations are equipped with TransCore’s Infinity digital express lane system, which consists of Encompass 6 readers that enable toll interoperability within the region and across the nation. They also include the intelligent vehicle identification system to accurately classify vehicles, the vehicle capture and recognition system to capture video images and a dynamic pricing module that accounts for specific roadway geometries, traffic patterns and operational business rules.

Related Content

  • July 12, 2024
    Alcea puts a lock on it in Texas
    Traffic cabinet locking solution boosts security in Dallas-Fort Worth metro area
  • February 18, 2013
    Texas and Oklahoma toll systems to go interoperable in 2014
    Officials in Texas and Oklahoma say their electronic toll systems could be interoperable in 2014. Chairman of the Team Texas Interoperability Committee Clayton Howe says the exact timing will be up to Oklahoma to decide but indications are it could be up and running by the end of the year. Interoperability will mean Texans will be able to travel Oklahoma's turnpikes and receive their tolls on their Texas accounts. Similarly, Oklahoma drivers will be able to drive on Texas tollroads and be billed to their Ok
  • April 25, 2012
    Houston TranStar wins 'Best of Texas' award
    Houston TranStar has been awarded "Most Innovative Use of Technology" by the Centre for Digital Government, a national research and advisory institute on information technology policies and best practices in state and local government, for its cutting-edge Bluetooth-based travel time information system. The new deployment, extending north more than 200 miles along the I-45 North corridor to Dallas, gives TranStar the capability to monitor and manage traffic conditions on this major evacuation route.
  • June 30, 2014
    Ferrovial consortium to build I-77 HOT lanes
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol