Skip to main content

Toll road tender announced

Moscow has announced a tender to build а toll road parallel to Kutuvkosky Prospekt, stretching from Moscow City’s business centre to the Moscow ring road and meet the M1 toll road. Expected to include four lanes of traffic, the US$1.1 billion project will take five to seven years to build, with the contract between the city and the winning tenderer lasting 40 years. The investor will be able to set the road's fare, though within limits prescribed by Moscow authorities. The city's head of construction,
March 18, 2014 Read time: 1 min
Moscow has announced a tender to build а toll road parallel to Kutuvkosky Prospekt, stretching from Moscow City’s business centre to the Moscow ring road and meet the M1 toll road.

Expected to include four lanes of traffic, the US$1.1 billion project will take five to seven years to build, with the contract between the city and the winning tenderer lasting 40 years. The investor will be able to set the road's fare, though within limits prescribed by Moscow authorities.

The city's head of construction, Marat Khusnullin, estimates that the road would have a throughput of 40,000 vehicles a day.

Related Content

  • July 31, 2012
    Russia's high speed toll link - aims and opportunities
    Construction of a new toll link between the Russian capital of Moscow and the country's second-largest city, the port of St Petersburg, is due to start in 2012. Here, ITS International takes look at the project to date and the opportunities for foreign companies to get involved. The construction of a new toll link between the Russian capital Moscow and the country's second-largest city St Petersburg has a number of aims. It will lead to the creation of a high-speed vehicular link between the two which will
  • August 23, 2016
    Asecap debates the future of tolling
    Colin Sowman reports form Asecap’s Study & Information Days event in Madrid. At Asecap’s (the Association of European Toll Road Operators) recent Study and Information Days event there was no doubt about the subject at the top of the agenda: the European Union Directive 23/2014/EU. This will introduce fundamental changes to the concession model under which Asecap members operate more than 50,000km of tolled highways and, in response, it has compiled a report entitled Proposal for a Sustainable Concession Mo
  • May 18, 2016
    Taking tolling towards new opportunities
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel
  • August 23, 2022
    Oslo falling short of 2023 cycle path goal
    The aim, which was set out in 2019, is to build 100km by next year