Skip to main content

Toll road tender announced

Moscow has announced a tender to build а toll road parallel to Kutuvkosky Prospekt, stretching from Moscow City’s business centre to the Moscow ring road and meet the M1 toll road. Expected to include four lanes of traffic, the US$1.1 billion project will take five to seven years to build, with the contract between the city and the winning tenderer lasting 40 years. The investor will be able to set the road's fare, though within limits prescribed by Moscow authorities. The city's head of construction,
March 18, 2014 Read time: 1 min
Moscow has announced a tender to build а toll road parallel to Kutuvkosky Prospekt, stretching from Moscow City’s business centre to the Moscow ring road and meet the M1 toll road.

Expected to include four lanes of traffic, the US$1.1 billion project will take five to seven years to build, with the contract between the city and the winning tenderer lasting 40 years. The investor will be able to set the road's fare, though within limits prescribed by Moscow authorities.

The city's head of construction, Marat Khusnullin, estimates that the road would have a throughput of 40,000 vehicles a day.

Related Content

  • Dutch strike public/private balance to introduce C-ITS services
    November 15, 2017
    Connected-ITS applications are due to appear on a nation-wide scale this summer, through the Netherlands’ Talking Traffic Partnership – if all goes to plan. Jon Masters reports. The Netherlands’ Talking Traffic Partnership (TTP) looks almost too good to be true: an artificial market set up and supported by national, regional and local government to accelerate deployment of Connected ITS (C-ITS) applications. If it does have any serious flaws, these are going to become apparent quite soon, because the first
  • TM 2.0 boost TMC data feed and driver influence
    November 15, 2017
    TM 2.0 views connected vehicles and V2I as two-way communications channels, benefitting traffic management and drivers, as Alan Dron discovers. As connected vehicles are progressively rolled out there will come a point at which traffic managers and traffic management centres (TMCs) will have to gear up to cope with a rapidly-evolving road scenario. The TM 2.0 Platform (see box) is promoting a concept of new-generation traffic management (which carries the same TM 2.0 title) and is studying how future T
  • FDOT to award Florida I-4 Ultimate project
    April 24, 2014
    The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
  • IBTTA: ‘The only way to keep up is to stay ahead’
    March 4, 2019
    The focus of the IBTTA’s Annual Technology Summit is changing. The tolling organisation’s Bill Cramer explains why this is good news for ITS professionals looking to embrace new technologies For a decade or more, the technology summits hosted by the International Bridge, Tunnel and Turnpike Association (IBTTA) have helped drive the tolling industry’s embrace of the systems, services and breakthrough concepts that are building a 21st century transportation sector. Now, the summit itself is adjusting its