Skip to main content

Telvent to implement tolling system in three Washington State projects

Telvent GIT has been selected by the Washington State Department of Transportation (WSDoT) to implement tolling systems through the Washington State Roadway Toll Systems Project. The project includes the implementation, maintenance and operation of three all-electronic tolling systems in the Puget Sound area: the SR-99 bored tunnel in Seattle scheduled to open in 2015, the new SR 520 floating bridge targeted to open in 2014, and the planned I-405 express toll lanes between Bellevue and Lynnwood.
July 24, 2012 Read time: 1 min
Telvent GIT has been selected by the 451 Washington State Department of Transportation (WSDoT) to implement tolling systems through the Washington State Roadway Toll Systems Project. The project includes the implementation, maintenance and operation of three all-electronic tolling systems in the Puget Sound area: the SR-99 bored tunnel in Seattle scheduled to open in 2015, the new SR 520 floating bridge targeted to open in 2014, and the planned I-405 express toll lanes between Bellevue and Lynnwood.

As the systems provider, 134 Telvent will implement its SmartMobility tolling system and extend its remote operations and maintenance system (ROMS), currently operational on the state’s SR 520 bridge. This will allow operators to accurately monitor toll systems operations and maintenance management to ensure the reliability and accuracy of the toll system.

For more information on companies in this article

Related Content

  • Managing Seattle’s congestion with Siemens intelligent software
    May 18, 2016
    The City of Seattle, Washington, is to implement Siemens’ Concert, an integrated traffic management platform that connects both Siemens and third-party systems across the city including traffic control centres, intersection controllers and parking guidance systems. The Concert platform will integrate Siemens’ TACTICS traffic control system as well as the city’s existing dynamic message sign management system the local travel time system and the Washington Department of Transportation (WSDOT) freeway sys
  • Kapsch wins in Australia
    December 20, 2013
    Kapsch TrafficCom has been appointed to deliver two high profile electronic tolling projects in Australia. The contracts will see Kapsch TrafficCom deliver multi-lane free-flow (MLFF) tolling solutions on the Eastern Distributor toll road in Sydney and the Legacy Way toll road in Brisbane using Kapsch multi-lane free-flow single gantry technology. Kapsch TrafficCom’s single gantry solution will be deployed in both projects and to provide stereoscopic vehicle detection and classification, front and rear l
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.
  • Varying acceptance of tolling in Africa
    January 6, 2016
    Tolling technology is now at an advanced state but governments have a key role in ensuring the success of schemes as is evident in Africa. Shem Oirere reports. According to the African Development Bank, the continent has an estimated $46bn of infrastructure financing deficit. The bank says sub-Saharan Africa requires $93bn annually to meet its infrastructure development needs - but only half of the financing is available.