Skip to main content

Telvent to implement tolling system in three Washington State projects

Telvent GIT has been selected by the Washington State Department of Transportation (WSDoT) to implement tolling systems through the Washington State Roadway Toll Systems Project. The project includes the implementation, maintenance and operation of three all-electronic tolling systems in the Puget Sound area: the SR-99 bored tunnel in Seattle scheduled to open in 2015, the new SR 520 floating bridge targeted to open in 2014, and the planned I-405 express toll lanes between Bellevue and Lynnwood.
July 24, 2012 Read time: 1 min
Telvent GIT has been selected by the 451 Washington State Department of Transportation (WSDoT) to implement tolling systems through the Washington State Roadway Toll Systems Project. The project includes the implementation, maintenance and operation of three all-electronic tolling systems in the Puget Sound area: the SR-99 bored tunnel in Seattle scheduled to open in 2015, the new SR 520 floating bridge targeted to open in 2014, and the planned I-405 express toll lanes between Bellevue and Lynnwood.

As the systems provider, 134 Telvent will implement its SmartMobility tolling system and extend its remote operations and maintenance system (ROMS), currently operational on the state’s SR 520 bridge. This will allow operators to accurately monitor toll systems operations and maintenance management to ensure the reliability and accuracy of the toll system.

For more information on companies in this article

Related Content

  • Knowing when to slow down
    August 8, 2018
    Level 2 driver assistance vehicles have little problem reading fixed metal signs at the roadside - but it’s a different story with VMS in tunnels, finds Alan Dron. Following a series of hands-free driving tests in tunnels, an Australian road authority believes that car manufacturers have to up their game before vehicles have the required levels of competence to consistently perform ‘assisted driving’ tasks. The trials, in the state of Victoria late last year, tested the ability of several vehicles to stay
  • FDOT to award Florida I-4 Ultimate project
    April 24, 2014
    The Florida Department of Transportation (FDOT) has announced its selection of I-4 Mobility Partners as the best value proposer for the reconstruction of Interstate 4 in Orange and Seminole counties and will post a Notice of Intent to Award later today. The I-4 Ultimate project is being procured by FDOT as a public-private partnership. The I-4 Mobility Partners team will design, build, finance, operate and maintain the project through a 40-year public-private partnership concession agreement at a total d
  • Toll performance exceeds expectations, improves travel times
    January 30, 2012
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • Indra picks up €75m dynamic toll system deal in US
    October 31, 2019
    Indra has been awarded a €75 million deal for work to switch a major US roadway to dynamic pricing.