Skip to main content

TBTA chooses TransCore to build tolling system in New York City

MTA Bridges and Tunnels (TBTA) has asked TransCore to design and build toll system equipment for the Central Business District Tolling Program (CBDTP) in New York City.
October 24, 2019 Read time: 1 min

The partners will work with the city’s department of transportation to install the toll system and infrastructure with the aim of reducing congestion and generating $15 million for the MTA 2020-2024 Capital Plan.

The New York Metropolitan Transportation Authority’s (MTA) $51.5 billion:

https://www.itsinternational.com/sections/transmart/news/new-york-to-pump-515bn-into-transit/ is to invest in the city’s subways, buses and railroads over the next five years.



TransCore, a tolling systems integrator, will operate and maintain the infrastructure and tolling system for six years. The $507 million contract also includes incentive payments to encourage on-time delivery.

TBTA says the toll system will be mounted on infrastructure similar to existing mast arms and poles in the city so that it fits with existing streetscapes.

The proposal is expected to get final approval from the board.

Related Content

  • ITS European Congress 2020: call for contributions
    October 17, 2019
    Ertico – ITS Europe is calling for contributions to the ITS European Congress taking place in Lisbon next year. Authors of papers and organisers of proposed sessions will be asked during the online submission process to explain how their contribution aids sustainability and reflects the Congress’ overall theme of ITS: The Game Changer. The Portuguese capital has been chosen as European Green Capital for 2020. In a new development, the category Commercial Papers has been replaced by Business Presentations,
  • LVCVA approves Elon Musk's underground people mover
    June 3, 2019
    The Las Vegas Convention and Visitors Authority (LVCVA) has approved a contract with Elon Musk’s The Boring Company (TBC) to construct an underground people mover. LVCVA says the $48.675,000 contract will allow TBC to build a people mover that could safely carry passengers in autonomous electric vehicles via a loop of underground express-route tunnels. The underground loop system is expected to offer reduced total costs and less disruption to pedestrian and vehicle traffic. Once complete, the loop is
  • Copenhagen light rail JV appointed
    February 13, 2015
    Copenhagen metro operator Metroselkabet has appointed Arup as part of a joint venture with Rambøll to develop the light rail on ring 3 for greater Copenhagen. The new light rail system includes a double track alignment of 27 kilometres and 27 stations with a rolling stock fleet of 27 light rail vehicles. This major project was planned to promote the use of public transport as well as encourage the urban development along the route and the passage across the city to avoid interchanging in the centre.
  • San Francisco area toll network to issue RFP for 90 miles of express lanes
    September 23, 2013
    Bay Area Infrastructure Financing Authority (BAIFA) has announced the competitive procurement of a toll system integrator (TSI) to design and provide toll systems for nearly 90 directional miles of toll express lanes and expects to be tolling a total of 270 miles within a few years. The plan is to develop toll express lanes following agreement on a regional network in which all the area's HOV lanes will be tolled for single and two occupant vehicles. The RFP covers three initial projects: 55 kilometres o