Skip to main content

Singapore awards tender for next-generation electronic road pricing system

Singapore’s Land Transport Authority (LTA) has awarded the tender to develop the next-generation electronic road pricing (ERP) system to the consortium of NCS and Mitsubishi Heavy Industries Engine System Asia. The LTA believes it is not practical to continue with the current gantry system, which is almost two decades old and will become increasingly expensive and difficult to maintain. The consortium will develop the next-generation ERP system based on global navigation satellite system (GNSS) Technolog
February 26, 2016 Read time: 2 mins
Singapore’s Land Transport Authority (LTA) has awarded the tender to develop the next-generation electronic road pricing (ERP) system to the consortium of NCS and 4962 Mitsubishi Heavy Industries Engine System Asia.

The LTA believes it is not practical to continue with the current gantry system, which is almost two decades old and will become increasingly expensive and difficult to maintain. The consortium will develop the next-generation ERP system based on global navigation satellite system (GNSS) Technology, at a cost of US$556 million.

The new system will allow for more flexibility in managing traffic congestion through distance-based road pricing, where motorists are charged according to the distance travelled on congested roads, which the LTA says would be fairer to motorists.

The existing in-vehicle unit (IU) will be replaced by a new on-board unit (OBU), which can also be used to deliver additional services to motorists, such as traffic advisories, parking payment checkpoint tolls and usage of off-peak cars electronically.

LTA’s Chief Executive Mr Chew Men Leong said, “Since introduction, the road pricing system has been effective in managing traffic congestion. The next-generation road pricing system will allow us to improve on this, with greater flexibility. It will also allow us to provide more services for motorists’ convenience, such as disseminating information on traffic advisories and facilitating e-payments.”

The new system is expected to be implemented progressively from 2020.  To ensure a seamless transition, there will an 18-month switchover period to transit from the current ERP system to the new system. The government will also bear the one-time IU replacement costs for Singapore-registered vehicles.

Related Content

  • May 9, 2012
    Singapore upgrading MRT for better reliability
    Singapore’s MRT system is being upgraded to become more reliable, said Transport Minister Lui Tuck Yew during the ground-breaking for the East-West MRT line's Tuas West Extension. According to Lui, the Land Transport Authority (LTA) will cover the cost of infrastructure works and the systems which will cost some US$719 million. The upgrade work will include the establishment of a more robust system by train operator SMRT.
  • January 10, 2014
    Will interoperability prevent progress?
    David Crawford examines the political and industrial background to the tolling technology debate. Saving the US State of California ‘millions of dollars’ in tolling infrastructure costs by encouraging new technologies is the professed aim of a legislative Bill, SB 242, which is currently moving through the State’s Senate (upper house) process. According to its sponsor, Republican State Senator Mark Wyland, permitting alternatives to the current FasTrak-branded radio-frequency identification (RFID)-based sys
  • October 1, 2015
    TransCore to upgrade Delaware River bridge toll system
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T