Skip to main content

Serco extends transport contracts in Hong Kong

UK group Serco has won the contract to operate and maintain toll roads in Hong Kong as it looks to push further into the transport sector. Beginning in September, the contract is worth US$123 million over a minimum six-year base period to manage, operate and maintain the Tsing Sha Control Area of toll roads. Serco has been contracted to engage in toll collection, controlling and regulating traffic, vehicle recovery and rescue, patrols and handling of incidents. The contract also covers scheduled works inclu
June 7, 2013 Read time: 2 mins
UK group 1676 Serco has won the contract to operate and maintain toll roads in Hong Kong as it looks to push further into the transport sector.

Beginning in September, the contract is worth US$123 million over a minimum six-year base period to manage, operate and maintain the Tsing Sha Control Area of toll roads.

Serco has been contracted to engage in toll collection, controlling and regulating traffic, vehicle recovery and rescue, patrols and handling of incidents. The contract also covers scheduled works including regular inspection and routine maintenance of bridges, buildings, tunnels, equipment, traffic signals and IT systems.

Serco chief executive Christopher Hyman said the group was pleased to expand its existing relationship with Hong Kong's Transport Department and extend its recent contract wins in the transport area.

He went on, "This announcement builds upon our recent significant contract win with the 1747 Virginia Department of Transportation in the US, and strengthens our global transport capabilities in preparation for further growth driven by expanding middle classes and mass urbanisation.  We anticipate further management, operation and maintenance opportunities in Asia, together with other exciting transport opportunities in Australia, India and the Middle East, all of which will leverage Serco's international skills and capabilities in this important market."

Serco, which already employs over 900 staff in Hong Kong as its largest tunnel operator, said it would partner with a number of specialist providers, including a joint venture partner Lam Construction.

Related Content

  • October 29, 2013
    Serco extends Dubai Metro contract
    International service company Serco Group is to continue to operate and maintain the Dubai Metro. The company has signed a five-year extension to its contract with the Dubai Government Roads and Transport Authority (RTA) in a deal valued at approximately US$571, with an opportunity to extend for a further two years to 2021. Serco first provided pre-launch consultancy and planning to the RTA from 2007 and began operating and maintaining the initial 10 stations on the Red Line from its official opening an
  • January 16, 2014
    Aecom awarded Hong Kong tunnel contract
    Aecom Technology Corporation has been awarded a consultancy contract worth around US$13 million for the design and an estimated US$103 million contract for the construction supervision of the Tseung Kwan O to Lam Tin (TKO-LT) tunnel project in Hong Kong. The tunnel will include a 2.6-mile, two-lane highway connecting Tseung Kwan O (TKO) at Po Shun Road in the east with the proposed Trunk Road T2 in Kai Tak development in the west. Along with the Central Kowloon Route and Trunk Road T2, the tunnel wil
  • May 22, 2012
    Hong Kong's integrated traffic management system
    Hong Kong’s Route 8 now features an extensive and advanced traffic control and surveillance system developed to overcome challenges of great scale and complexity, write Delcan vice president Rex Lee and MD Joseph Lam
  • June 26, 2012
    Jenoptik Traffic Solutions to supply speed enforcement systems to Hong Kong
    The Traffic Solutions division of Jenoptik has announced it will be supplying over 30 installations, consisting of a mix of fixed, tunnel and mobile speed enforcement applications in the Tsing Ma and Tsing Sha Control Areas. Recently, the approval authority delegation from Hong Kong visited Jenoptik Robot in Germany to successfully perform a factory acceptance test. Close to 70 tests were performed over a period of five days to ensure the systems fully comply with the specifications in the tender. First del