Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Researchers use drones to assess infrastructure damage
    March 6, 2015
    Researchers at the University of New Mexico, along with collaborators at San Diego State University and BAE Systems, are utilising drone technology to develop an operational prototype to assess infrastructure damage. The drone will use innovative remote sensing approaches and cameras mounted on low cost aircraft or unmanned drones to detect and map fine scale transportation infrastructure damage such as cracks, deformations and shifts immediately following natural disasters such as earthquakes, floods and h
  • Key airport link open in US
    May 17, 2012
    The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route. This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area. Customers using the Airpor
  • Congestion pricing - no such thing as a free ride
    October 2, 2018
    The widespread adoption of autonomous vehicles is likely to increase congestion, many experts believe. But Wes Guckert of Traffic Group believes that tolling could provide the answer. While it is still hard to wrap your head around the idea of getting into a vehicle without a driver, the industry is now used to hearing, reading, participating in the advancement of autonomous vehicles (AVs). Those in the industry have heard about Uber delivering a shipment of Budweiser, or the convoy of driverless trucks
  • Contracts awarded for Riyadh six-line metro
    July 30, 2013
    The government in Riyadh, Saudi Arabia, has awarded three engineering and construction packages for its six-line metro project. The contracts, worth around US$22 billion, have been awarded to a consortium of the US's Bechtel, Germany's Siemens, the regional Consolidated Contractors Company and Saudi Arabia's Almabani; a consortium led by Italy's Ansaldo STS; Spain's Fomento de Construcciones y Contratas (FCC), France's Alstom and South Korea's Samsung C&T.