Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.
  • The benefit of Lidar: touch, don’t look
    September 28, 2020
    The benefits of Lidar as a safety device for automobiles rather than as an enabler for AVs are easy to overlook – but Dr Jun Pei of Cepton Technologies tells Adam Hill why that would be a big mistake
  • RATP Dev wins new contract in Pennsylvania
    August 13, 2015
    RATP Dev has won a five-year contract to run school bus services in the Southern Columbia Area School District, Pennsylvania. The service transports around 1,500 students daily with a fleet of over 30 vehicles that travel more than 640,000 km (400,000 miles) per year. The five-year contract includes an optional three-year extension. “The new contract will further consolidate the presence of RATP Dev in the USA and will help the group continue to grow and develop in this key territory”, stated François
  • San Francisco transit systems targeted by hackers
    November 28, 2016
    San Francisco’s Municipal Transportation System has apparently been targeted by hackers over the Thanksgiving holiday weekend, the agency to shut down its light-rail ticketing machines and point-of-payment systems and allowing passengers to ride for free. Agency computers displayed the message "You Hacked, ALL Data Encrypted", the San Francisco Examiner reported on Saturday. According to the BBC, the hackers have made a ransom demand of 100 Bitcoin, which amounts to about $70,000 (£56,000). Jon Ge