Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Drivewyze introduces notification service for truck drivers
    August 16, 2019
    US technology company Drivewyze has launched a notification service that issues an audible tone and visual alert when a truck approaches dangerous curves or low bridges. Brian Heath, CEO of Drivewyze, says the company’s rollover alerts, on targeted exit ramps and curves, are geo-fenced at 500 locations in 32 states. “We worked closely with our state partners to identify the areas that had higher incidences of rollovers, so our alerts offer an early warning to drivers to check their speed,” he adds. The
  • Oklahoma turnpikes go cashless
    November 26, 2024
    OTA says there were 500 crashes at toll booths from 2015-21
  • Cubic’s holistic view of traffic management
    May 25, 2022
    How can cities and transit agencies ease congested roadways? Andy Taylor of Cubic Transportation Systems suggests it would help to take a more holistic view of the problem
  • Buses services benefit from seamless Wi-Fi data transfer
    April 9, 2014
    Ted Bowser explains how the almost total Wi-Fi coverage at Ride-On’s new bus garage is providing big benefits for the operator and passengers alike. The ability to download and upload data to and from the various systems on board buses has become central to mass transit operators’ business model. So when Ride-On, the public transportation system in Maryland’s Montgomery County, was moving one of its three depots into a bigger and purpose-built facility, connectivity was a key consideration.