Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • As many as '50,000' daily cases of illegal phone use on English roads
    June 17, 2024
    Results from UK DfT and Aecom using Acusensus tech suggest worrying scale of problem
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • Massachusetts plans all-electric tolling
    March 8, 2013
    Massachusetts Department of Transportation (MassDOT) is committed to implementing all-electronic tolling (AET) by the middle of 2016; the Tobin Bridge will be converted first as a demonstration to familiarise the public, according to Frank DePaola, the state's highway administrator. The state is going all-electronic because with modern technology it's the most cost-effective way to collect tolls, and because it reduces delays to motorists and improves safety at toll points, he said. MassDOT has estimated it
  • Safelane automates work zone perimeter guarding
    June 12, 2015
    The safety of workers during road closures and working alongside, or above, live lanes is becoming an automated process. Ten workers suffered major injuries while working on or near motorways and major A roads in England in 2013, and between 2009 and 2013 eight had been killed. It was against that background that the first commercial application Safelane, the automated traffic management system designed to detect work zone incursions, was carried out during the temporary closure of a motorway.