Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • Ability to keep in touch on US buses woos travellers
    February 1, 2012
    David Crawford finds evidence of a new trend in American intercity travel: that better access to data sources on the move is tempting passengers away from air travel and onto surface modes. In the US the ease of use of Portable Electronic Devices (PEDs) is successfully wooing long-distance travellers away from airlines and onto surface public transport, according to just-published research. Using data from field observations of 7,028 passengers travelling by bus, air and train in 14 US states and the Distri
  • Ability to keep in touch on US buses woos travellers
    February 1, 2012
    David Crawford finds evidence of a new trend in American intercity travel: that better access to data sources on the move is tempting passengers away from air travel and onto surface modes. In the US the ease of use of Portable Electronic Devices (PEDs) is successfully wooing long-distance travellers away from airlines and onto surface public transport, according to just-published research. Using data from field observations of 7,028 passengers travelling by bus, air and train in 14 US states and the Distri
  • Gotthard Base Tunnel opens in Switzerland
    June 1, 2016
    After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al