Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Jenoptik supplies sophisticated multi-section control project
    November 17, 2014
    Efficient speed enforcement in the most highly frequented tunnel in Austria on the A7 near Linz. The Bindermichl-Niedernhart tunnel complex on Austrian highway A7 connects the major east/west A1 route from Vienna/ Bratislava to Munich/Salzburg with the A7/ E55 running south from Prague in the Czech Republic. This happens right in the middle of the city of Linz, Austria.
  • Hydrogen filling station operating in California
    April 11, 2012
    Linde North America, a specialist in the design, construction and operation of hydrogen vehicle fuelling systems, has commissioned an installation at AC Transit, the bus operator for 13 cities in the East Bay Area, including Emeryville, Oakland and Berkeley, and also operates trans-bay service to San Francisco. The Emeryville hydrogen fuelling station, which is now fuelling 12 fuel cell buses and up to 20 passenger cars a day, is one of two Linde is supplying to AC Transit. The second, located at the Oaklan
  • US ITS sector needs strategic leadership
    January 31, 2012
    The US is losing its advantage in the ITS sector because of a lack of strategic leadership, according to a new report from the Information Technology and Innovation Foundation. Here, Stephen Ezell, one of the report's authors, talks to ITS International about what can be done to remedy the situation. A new report from the Information Technology and Innovation Foundation (ITIF), Explaining International IT Leadership: Intelligent Transportation Systems, makes for sobering reading within the US ITS community.
  • Intertraffic Amsterdam date for Kistler bridge monitoring portfolio
    February 29, 2024
    Kistler is also bringing its new KiTraffic Digital Platform WiM system to Amsterdam in April