Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • June 6, 2014
    App informs drivers of delays during Long Beach bridge replacement
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • January 10, 2014
    The sunshine subsidy for Colorado’s tollways
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • January 26, 2012
    Refurbishing ageing VMS with new technology
    Virginia DoT faced a challenge common to many highway authorities around the world: the need, in economically challenging times, to replace ageing variable message signs reaching the end of their operational life. For some 25 years now, since the mid 80s, Virginia Department of Transportation (VDoT), has deployed variable message signs (VMS) as part of its motorist information systems. Throughout the state there are still many old 'flip-disk' signs. Some of the companies that provided these electronic messa
  • March 15, 2012
    Traffic signal priority initiatives aid better bus travel
    David Crawford investigates traffic signal priority initiatives developing for better bus travel on the US Pacific Coast Transit patronage rises by an average of 35% along commuter corridors equipped with bus rapid transit (BRT) systems, according to the US Department of Transportation’s Federal Transit Administration (FTA). BRT as defined as bus transit enhanced with ITS systems for better services, is winning new passengers attracted by opportunity to avoid increasing fuel costs and traffic congestion.