Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Ohio River Bridges East End crossing project opened to traffic
    December 21, 2016
    The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
  • Egis awarded second Turkish motorway contract
    June 25, 2013
    French engineering and consulting group Egis has been selected by Turkish toll concessionaire Oyotol as its partner for the operation and maintenance of the Gebze-İzmir motorway in Turkey. The deal follows the award of the Eurasia tunnel in 2012. The Build, Operate and Transfer (BOT) project is being carried out on behalf of the Turkish General Directorate of Highways and is said to be the largest BOT project in Turkey to date. It includes 420 km of motorway (2x3 lanes) between Gebze on the North shore of
  • WiM avoids bumps in the road
    May 5, 2020
    Road surfaces are deteriorating as years of budget squeezes bite among local authorities. Adam Hill asks leading Weigh in Motion players what effect this might be having on the accuracy of their technology – and how authorities can be made to see that WiM is a helpful tool
  • Network Rail warns commuters after near misses with trains
    March 3, 2016
    Britain’s network Rail is warning commuters to take care on level crossings after new figures revealed that more than half of all near misses with trains at level crossings over the last five years took place during the evening rush hour. To combat the problem and help improve the safety of everyone who travels on or across the railway, Network Rail has launched a new level crossing safety awareness campaign targeting commuters, reminding them to take care at level crossings, particularly as they travel