Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Humber Bridge toll goes ORT
    October 17, 2014
    Civil engineering firm Britcon has completed works for a new US$8.8 million state-of-the-art toll collection facility on the Humber Bridge to replace the toll collection system which was installed in 1981. The new collection system will include one of the first open road tolling arrangement to be installed in the UK, where vehicles do not need to stop while driving through the toll plaza. Britcon undertook full infrastructure works for the project on behalf of Sociedad Ibérica de Construcciones Eléctrica
  • The UK’s busiest crossing adopts free flow charging
    April 30, 2015
    Colin Sowman looks at the transition to free-flow charging on the Dartford Crossing, a notorious congestion blackspot on the UK motorway network. The Dartford Crossing, where London’s orbital M25 motorway crosses the lower reaches of the River Thames 32km (20 miles) to the east of Central London, has long been a major source of congestion. Now, to alleviate the congestion caused by some 50 million crossings per year, the Highways Agency has adopted a free-flow charging system - but the Crossing’s location a
  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle
  • Adaptive control reduces travel time, cuts congestion
    January 20, 2012
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.