Skip to main content

San Francisco Bay Bridge east span opens

After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span. The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.
September 5, 2013 Read time: 1 min
After years of delays and cost overruns, the newly built US$6.4 billion eastern span of the San Francisco-Oakland Bay Bridge opened with few problems other than the traffic snarls that were common around the toll plaza of the old span.

The single pylon suspension span replaces a structure that was damaged during the 1989 Loma Prieta earthquake. It is designed to withstand the strongest earthquake estimated by seismologists to occur at the site over a 1,500-year period.

One of the busiest spans in the United States, the single-towered, 634 metre long self-anchored main span is more than twice the length of the previous record holders, Japan's Konohana Bridge and South Korea's Yeongjong Grand Bridge, according to the Structurae engineering database.

It has been completed six years behind schedule at five times over budget. It will be used by some 280,000 daily commuters.

Related Content

  • Apps help passengers avoided overcrowded public transport
    May 30, 2013
    David Crawford reviews innovations in the comfort zone. Anyone who rides public transport knows that, perhaps second only to delays, overcrowding is a critical part of the passenger experience,” says Nir Erez, CEO of Moovit, the Israel-based social transportation app developer. The app is aimed at taking real-time user feedback on transit and making it available to a wider audience of travellers. Currently available on iPhone and Android, it plans to add Windows 8 and other platforms in the future. Moovit i
  • Turkey’s Osman Gazi Bridge opens to traffic
    July 26, 2016
    Turkey’s Osman Gazi Bridge, part of the Gebze-Izmir toll motorway, and one of the largest projects operated by Egis, has been opened to traffic, providing a time-saving alternative to the road route around the Izmir bay and to the ferry service crossing the strait. The 3.3 km suspension bridge has a central span of 1,550 metres, the fourth longest in the world for this type of bridge. The project is operated by GIIB (Gebze-Izmir Isletme Ve Bakim), a 50/50 subsidiary of the Egis group and the concess
  • Road pricing is inevitable – because the ‘user pays’ principle is fair
    June 14, 2018
    We pay for roads through our taxes: the poor pay proportionately more, and effectively subsidise the rich. It would be fairer to accept the ‘user pays’ principle, says Dr John Walker. Road pricing is already used worldwide to combat congestion and pollution, to compensate for falling revenues from fuel duty (‘gas tax’), to provide an alternative (and fairer) means of charging motorists than the 80-year old fuel tax and to improve the efficiency of and expand transport infrastructure. However, it could and s
  • SCANaCAR and VideoBadge counter parking’s prickly problems.
    June 4, 2014
    Colin Sowman discovers how the latest systems can boost productivity and reduce conflict in parking enforcement. Parking enforcement is something of a ‘Cinderella’ service for local authorities: while necessary to keep the roads open and the traffic flowing, it is an expensive operation and can be loss-making. It is also labour intensive and parking enforcement officers are routinely verbally abused and sometimes physically attacked. Some authorities are now looking to automate parking enforcement in orde